Skip to main content

Connect the Physical and Virtual World to Better Plan, Design, Construct, and Operate Your Road Networks

Many bridges and roads around the world are in poor condition due to age, wear and tear, and environmental factors, requiring repair or even replacement. To make our roads and bridges safer, transportation agencies must prioritize strategic investments to improve and preserve roadway conditions, as well as plan for constructing new roadways.
January 12, 2023 Read time: 1 min

 

To do their job better and faster, transportation agencies need innovative technologies and processes, including digital twins. Digital delivery incorporates streamlined processes to manage asset information changes throughout the project. With this delivery method, it’s easier to review design intent and develop high-resolution 3D design visuals, providing improved design quality. Digital delivery also improves design efficiency and enables contractors to benefit from a more complete representation of the design intent delivered in a more directly usable format.

Read our e-Book to learn how users in Europe are leveraging digital twins to synchronize work, gain greater visibility, and make sense of the right data at the right time across the lifecycle of assets.

Download the eBook

Content produced in association with Bentley Systems

For more information on companies in this article

Related Content

  • VDMA: Construction equipment sector secures jobs in a challenging environment
    March 5, 2021
    The general meeting of VDMA Construction – Equipment and Plant Engineering on 3rd March 2021 drew a positive conclusion about the past and current year. Central topics were the economic situation, the importance of the European climate goals 2050 for the industry and the development in relations with the USA after the change of government.
  • RMD Kwikform: the role of temporary works in the age of BIM
    April 19, 2018
    Formwork and shoring are no longer isolated services that stand outside the design process of infrastructure projects, as Simon Dowd* explained In recent years, the roles of suppliers have changed as client and main contractors require more visibility and data from their construction sites. Due to the requirements of BIM - building information modelling - and the adoption of digital processes, it is no longer the role of a temporary works business to simply provide formwork and shoring. Simon Dowd said
  • Efficient Load Out: the digital solution revolutionising mass excavation projects
    November 15, 2021
    Staying connected to customers and colleagues has never been more important and over the last two years, adoption of innovative technologies that enable this has accelerated in businesses in every sector around the world. And for Volvo Construction Equipment, the construction site is no different. Efficient Load Out is a digital solution which connects machine operators, truck drivers and site managers in real-time to maximise the profitability and sustainability of mass excavation projects
  • SEOPAN’s Julián Núñez takes over at ASECAP
    January 9, 2024
    Núñez has been president of Seopan, the Spanish Association of Infrastructure Contractors and Concessionaires, since 2013.