Skip to main content

Concrete pumping at Chinese bridge

Two XCMG HB41K truck-mounted concrete pumps have successfully completed construction of box girders for the Nanning-Guangzhou bridge. The work carried out by the two machines was complex and required them to be on site for more than 1,000 days in all. During the project construction, the team used a number of concrete pumps from other suppliers but these proved unequal to the task. However when the XCMG machines were brought to the site, these proved successful in the application. The bridge will provide
June 10, 2015 Read time: 1 min
Two 2490 XCMG HB41K truck-mounted concrete pumps have successfully completed construction of box girders for the Nanning-Guangzhou bridge. The work carried out by the two machines was complex and required them to be on site for more than 1,000 days in all.

During the project construction, the team used a number of concrete pumps from other suppliers but these proved unequal to the task. However when the XCMG machines were brought to the site, these proved successful in the application.

The bridge will provide a key transport connection in China, connecting Southwest China with South China.

For more information on companies in this article

Related Content

  • Machine guidance and asset management aid fleet utilisation
    July 16, 2012
    Integrating Caterpillar's latest machine guidance and asset management tools offers efficiency gains for contractors in a competitive market. Mike Woof reports Caterpillar has been a leader in the development of GPS machine control systems through its partnership with Trimble. The manufacturer has rolled out a series of AccuGrade packages for various machines in its line-up, starting with the dozers and graders and then spreading to other machines such as scrapers, excavators and soil compactors. Caterpilla
  • Pocitelj Bridge reaches banks of Neretva River
    August 21, 2023
    Contractors are working to correct a concrete issue on a section of the 100m-long continuous prestressed girder bridge across the Neretva River in Bosnia and Herzegovina.
  • CIFA K36L-5, a 5-arm concrete pump like never before
    September 7, 2021
    CIFA presents a new truck-mounted pump model: K36L-5 - where “K” stands for truck mounted pump. Meanwhile, “36” stands for the length in metres of the boom, “L” for Steeltech line (the most customisable and highest-quality line in the product range) and finally “5” for the number of boom sections. The new product is being launched with the slogan “5 arms like never before” to underline the peculiarity of this machine, a novel pump in its size class, thanks to its sophisticated smart boom and light weight.
  • Panama highway rebuilt with concrete
    January 5, 2017
    A highway link to the north of Panama´s capital city that connects with a national park popular with tourists, has now been rebuilt Cement producer and concrete specialist CEMEX carried out a study into the project, to find a cost effective solution. And working with CEMEX, Panama’s Ministry of Public Works began planning for the project in 2015. A 5.7km stretch of the highway has now been improved, with the road structure being built from concrete.