Skip to main content

Concrete pumping at Chinese bridge

Two XCMG HB41K truck-mounted concrete pumps have successfully completed construction of box girders for the Nanning-Guangzhou bridge. The work carried out by the two machines was complex and required them to be on site for more than 1,000 days in all. During the project construction, the team used a number of concrete pumps from other suppliers but these proved unequal to the task. However when the XCMG machines were brought to the site, these proved successful in the application. The bridge will provide
June 10, 2015 Read time: 1 min
Two 2490 XCMG HB41K truck-mounted concrete pumps have successfully completed construction of box girders for the Nanning-Guangzhou bridge. The work carried out by the two machines was complex and required them to be on site for more than 1,000 days in all.

During the project construction, the team used a number of concrete pumps from other suppliers but these proved unequal to the task. However when the XCMG machines were brought to the site, these proved successful in the application.

The bridge will provide a key transport connection in China, connecting Southwest China with South China.

For more information on companies in this article

Related Content

  • India’s capital highway project will improve transport connections
    October 10, 2017
    Huge numbers of construction machines as well as plant and equipment are working overtime, backed by mammoth manpower, to meet the targeted completion deadline of March 2018 for India’s Eastern Peripheral Expressway (EPE). The 135km arterial route is being built with six lanes and surrounds India’s National Capital, Delhi, its National Capital Region (NCR) and the industrially developed North Indian states of Haryana and Uttar Pradesh.
  • New bridge refurbishment solutions now available
    July 15, 2015
    An array of new bridge refurbishment and repair solutions are available – Mike Woof writes Around the world there are many bridges requiring repairs or refurbishment, and there is a ready market for novel solutions to upgrade existing structures. New developments offer quicker and more efficient ways to improve bridge surfaces and structural performance and add new life to ageing designs. Spancrete is broadening the availability of its novel precast building solutions worldwide by offering these to th
  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong