Skip to main content

Concrete paving at US airport

A slipformer from Power Pavers has been carrying out paving work at an airport in the US.
By MJ Woof October 1, 2024 Read time: 1 min
Contractor Metro Paving has been using an SF-1700 slipformer from Power Pavers to lay slab for new taxiways

An SF-1700 concrete paver from Power Pavers has been used to lay the slab for a new taxiway at an airport in the US state of Iowa. The machine was employed by contractor Metro Paving to lay down slabs with thicknesses ranging from 165-355mm. The widths of the slabs ranged from 3.8-6.7m. The firm has laid several stretches of slab with the longest so far measuring 305m.

The new taxiway is part of a series of upgrades at the airport, intended to improve and update the facilities. The slipformer from Power Pavers is said to have worked reliably on the project, one of several pieces of equipment employed by Metro Pavers for the project.

 

For more information on companies in this article

Related Content

  • Power Curbers focuses on slipforming versatility
    April 30, 2013
    Power Curbers and its sister company Power Pavers exhibited the adaptable 5700-C and SF-1700 models at bauma, slipformers that have been both designed to provide the customer with a high degree of versatility.
  • Producing recycled materials at an airport for surface use
    October 1, 2018
    Recycling of materials has been carried out at Cologne/Bonn Airport in a move to boost efficiency Using the Wirtgen KMA 220 mobile cold recycling mixing plant allows road construction materials to be recycled or upgraded onsite and avoids the need for numerous transport trips. The system is also economical, as became clear from a job at Cologne/Bonn airport at the end of 2017. There the plant, located immediately next to the job site, produced around 11,000tonnes of materials for a hydraulically bound ba
  • Wirtgen Group machines delivering new runway for German airbase
    October 26, 2016
    Machines from the Wirtgen Group are carrying out an important reconstruction job for the surface course at Büchel Air Base. Road machinery from Hamm, Vögele and Wirtgen as well as asphalt plants from Benninghoven have been carrying out the work, delivering a new runway within a tight timeframe. To achieve this, the work had to be planned well in advance, with the contractors organising the logistics and their personnel accordingly.
  • Peru’s Oyón -Ambo Highway presents challenges
    August 30, 2022
    Peru’s Oyón-Ambo highway project represents a landmark in construction for the country, while facing significant technical challenges – Paula Chapple, editor of Carreteras Pan-Americana (CPA), writes