Skip to main content

‘Concrete multinational’ Simem grows in scope and expands in all directions

Concrete specialist Simem’s most recent launch is the Bison mobile batching plant. Designed with road construction in mind, the Bison range benefits from a sophisticated weighing mechanism, created over a three-year research and development programme with input from the Politecnico di Milano’s mechatronic department.
July 10, 2023 Read time: 2 mins

 

“Despite the fact that it is very mobile and batches continuously, we have been able to achieve a very high level of accuracy with the weighing system which means that it produces consistent concrete mixes and performance,” says Simem CEO Federico Furlani. Bison can be used to produce concrete of any class, asphalt mixes or even stabilised soil.

The Bison does not require foundations or a crane, elevating itself via four hydraulic legs. This means it can be set up within a couple of hours, says Furlani. Compact in design, so it can be transported on roads without any special permissions, the Bison comes in two models: Bison 250, which can produce between 100 and 250tonnes of material per hour and Bison 500 which can produce between 200 and 500tonnes per hour.

Simem has been expanding on several fronts, adding to its products and ranges, increasing its geographical spread and growing the scope of its offering through the purchase of two new companies back in 2016.  Simem Spil, based in Treviso, Italy, is a specialist in precast concrete equipment while Simem Underground, based in Vancouver in Canada, provides all forms of concrete equipment for underground construction. “We are a mini multinational now,” says Furlani.

Simem exports to over 120 countries with factories in Verona, Italy and in Vadodara, India, which it has recently expanded to serve the African and Middle East markets. It also has sales and services centres in Germany and the US.

For more information on companies in this article

Related Content

  • Nigeria’s giant city Lagos to benefit from a new cable-stayed bridge
    September 19, 2012
    The first cable-stayed bridge in Nigeria will link two districts of the megacity of Lagos Nigeria’s first cable-stayed bridge, the Lekki Ikoyi Bridge in the megacity of Lagos is scheduled for completion at the end of 2012. Its striking 90m high pylon characterises the appearance of the 1,357m long bridge, which will connect two districts of the West African city, Lekki on the Lekki Peninsula and Ikoyi on Lagos Island.
  • Istanbul’s new airport benefits from Wirtgen Group machines
    November 22, 2017
    Construction of Istanbul’s new airport facility is benefiting from the use of a large fleet of machines from the Wirtgen Group. When it is complete, this will be the world’s largest airport and will be able to handle 150-200 million passengers/year as well as 6 million tonnes of freight/year. This will make the facility substantially larger than the world’s current largest airport, the Hartsfield-Jackson Atlanta International Airport, which handles around 105 million passengers/year.
  • A European Deere?
    July 4, 2018
    Iconic US manufacturer John Deere is back in Europe, thanks to its purchase of Wirtgen. David Arminas looks at what’s in store The gods were smiling on the Wirtgen Group for the company’s Road Technology Days 2018 event. This year it was held in summer-like weather at the recently expanded Voegele plant near Mannheim in Germany. Within days in northern Europe the season dramatically changed from dreary chilly late winter to glorious high temperatures, just in time to bathe the amassed demonstration equi
  • Bitumen technology: crude moves and carbon savings for the industry
    July 11, 2022
    As bitumen suppliers look to replace Russian sources of crude oil, there’s a race to get biogenic asphalts to market – and bank those carbon-saving benefits - Kristina Smith writes