Skip to main content

Clean screen

A British woman discovered that the windscreen washer fluid in her Toyota had run out, so she stopped at a filling station for a refill. However the air and water dispensers were out of order and when she asked inside the filling station, was told that she was not allowed a bucket of water to refill the fluid reservoir or wash her windscreen as this contravened the firm's health and safety policy. Using a cloth she managed to clear the screen sufficiently to allow her to drive 3km to another filling station
February 24, 2012 Read time: 1 min
A British woman discovered that the windscreen washer fluid in her Toyota had run out, so she stopped at a filling station for a refill. However the air and water dispensers were out of order and when she asked inside the filling station, was told that she was not allowed a bucket of water to refill the fluid reservoir or wash her windscreen as this contravened the firm's health and safety policy. Using a cloth she managed to clear the screen sufficiently to allow her to drive 3km to another filling station with a more sensible approach to health and safety regulations.

Related Content

  • On site: VÖGELE SUPER 1803-3i paver
    July 30, 2020
    Improving a helipad 2,100m up in the Austrian Tyrol was exactly the type of demanding work for which the SUPER 1803-3i wheeled paver was made.
  • Sand, gravel and asphalt, building Poland’s roads
    February 24, 2012
    A new quarry is producing top quality aggregates for Poland's massive road construction programme writes Claire Symes. Wakoz Beton's Glazica sand quarry in Poland is a major source of high quality sand and gravels for the Gdansk construction market. The site is modern and only opened in 2006 but Wakoz Beton has continued to invest in facilities to improve its efficiency and output quality. The installation of a CDE mobile washing plant at the site last year is allowing it to provide materials for concrete.
  • Lower traffic emissions in London
    May 20, 2019
    London’s ultra-low emission zone (ULEZ) system is already proving successful. In the first month since the scheme was introduced, the number of non-compliant vehicles entering the charging zone has been reduced by 9,400/day, a drop of 26%. According to the latest research, 74% of vehicles entering the ULEZ have been in compliance with the emission requirements.
  • GPS machine control boosts road surface quality
    February 14, 2012
    The use of GPS machine control on sub-base has improved final rideability on a major highway reconstruction project. Innovative construction techniques have helped to upgrade a 9.6km stretch of the 307km long I-96 highway in the US state of Michigan. The Michigan Department of Transportation (MDOT) project was initiated in the third quarter of 2009 and was completed in the fourth quarter of 2010. Interstate Highway Construction acted as general contractor on the project, which included widening the shoulder