Skip to main content

CIFA goes carbon with its K53 and K60H truck-mounted pumps

CIFA, an Italian manufacturer of concrete machinery is unveiling its latest addition to its CarboTech family of truck-mounted pumps. The K53 has as 53m boom made of five sections, with the last two section made of carbon. The K60H is a 60m version, consisting of six sections, the final two in carbon fibre. Weight of the machines has been carefully monitored, according to CIFA, which is based in Senago, near Milan, but has been part of the Chinese group Zoomlion since 2008. For both models, users can load
January 30, 2015 Read time: 2 mins
CIFA,s CarboTech family highlighted at INTERMAT
2203 CIFA, an Italian manufacturer of concrete machinery is unveiling its latest addition to its CarboTech family of truck-mounted pumps. The K53 has as 53m boom made of five sections, with the last two section made of carbon. The K60H is a 60m version, consisting of six sections, the final two in carbon fibre.

Weight of the machines has been carefully monitored, according to CIFA, which is based in Senago, near Milan, but has been part of the Chinese group 1175 Zoomlion since 2008. For both models, users can load accessories, water, diesel and other items without breaching circulation rules, special permits and technical limits of the carrying vehicles.

CIFA has also recently restyled the MK25H truck mixer pump that was introduced in 2013. The MK25H has four booms, the last two booms in carbon fibre. The machine’s new 607 CC EPC closes circuit pumping unit is operated electronically and allows a linear cast without shakes.

The boom can be opened in 5.2m height only and it reaches a pumping height of more than 24m, with a horizontal opening of over 20m.

For more information on companies in this article

Related Content

  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b
  • Efficient aggregate production technology
    July 13, 2020
    Efficient aggregate production technology is now coming to market, offering lower cost/tonne production
  • Tough competition in concrete paving market
    February 13, 2012
    One thing is clear in the concrete slipforming sector. This comparatively niche market for equipment is rapidly becoming a good deal more competitive as key manufacturers jostle for position.
  • Kuwait’s key causeway contract under construction
    July 4, 2016
    A new causeway, crossing the Bay of Kuwait, is under construction and providing a major engineering challenge - Mike Woof reports. The new Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project being built across the Bay of Kuwait is a massive engineering project that is costing around US$3 billion in all. This highly complex project involves the design, build, completion and maintenance of the causeway, which spans Kuwait Bay between Kuwait City and the Subiyah area. The 36km Sheikh Jaber Al-Ahmad Al-Sabah Cau