Skip to main content

Chain link design refined by pewag for durability

Possibly the oldest company at INTERMAT - pewag, whose origins date back to 1479 - showed new chain link designs for its range of tyre protection products and new vertical lifting clamps. The pewag tycoon ultra-resistant link now features a wider design for greater stability and longer life due to a greater wear surface. The design also reduces the movement between link and ring which contributes to increased lifetime. The tycoon link is aimed at giant wheel loaders and operations in the most abrasive har
April 23, 2015 Read time: 2 mins
The pewag tycoon chain link offers greater stability and longer life
Possibly the oldest company at INTERMAT - 8072 pewag, whose origins date back to 1479 - showed new chain link designs for its range of tyre protection products and new vertical lifting clamps.

The pewag tycoon ultra-resistant link now features a wider design for greater stability and longer life due to a greater wear surface. The design also reduces the movement between link and ring which contributes to increased lifetime. The tycoon link is aimed at giant wheel loaders and operations in the most abrasive hard rock conditions.

The firm also showed samples of a new chain link it has under development for snow applications. The link has a flat surface on its interior and a round surface on the exterior that prevents chains made with the links from twisting on the tyres to which they are fitted. The new design improves efficiency and durability of chains, says Jean-Marie Monat, commercial manager for pewag France. Also, the grip element of the link now has indentations that provide more surface area to give 7% longer life than previous designs. The links will be available on pewag’s range of snow application chains for winter 2015, says Monat.

The company is also planning to introduce a new range of chain tracks for forestry applications in September 2015.

The pewag winner vertical lifting clamps are designed for lifting and moving steel beams, profiles and structures where the load must stay in position. The special shape of the lifting shackle places the centre of the gravity of the beam beneath the lifting shackle. This maintains the equilibrium of the beam once it has been lifted and keeps the flanges vertical so that the beam can easily be stacked or positioned.

For more information on companies in this article

Related Content

  • Earthmoving in advance – new technologies for shifting dirt
    February 9, 2018
    Earthmoving machine manufacturers are developing innovative new solutions for customers - Mike Woof reports. In the separate markets for excavators, wheeled loaders, graders and dozers, new models are being unveiled from several key firms. The excavator market is one of the most competitive and it is no surprise that some of the most innovative machines are being developed for this segment. Excavating One of the most significant excavator launches has been for the latest Hitachi hybrid model, which i
  • A new additive for self-de-icing asphalt mixture roads in winter
    December 14, 2020
    A new additive from Iterchimica aims to help minimise icing on asphalt surfaces in winter conditions
  • Safety advice for poor weather driving
    December 11, 2013
    Winter driving advice is being provided by the Finnish Vaisala transport research group. According to Vaisala, the driver plays a particularly important role in safety with regard to winter conditions. Driving safely in the winter is not only about road maintenance services and the condition of the road. Driver behaviour, speed, and driving style as well as the condition of the vehicle and its tyres play an important role in ensuring a safe journey. For example, awareness of significantly longer stopping di
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w