Skip to main content

Chain link design refined by pewag for durability

Possibly the oldest company at INTERMAT - pewag, whose origins date back to 1479 - showed new chain link designs for its range of tyre protection products and new vertical lifting clamps. The pewag tycoon ultra-resistant link now features a wider design for greater stability and longer life due to a greater wear surface. The design also reduces the movement between link and ring which contributes to increased lifetime. The tycoon link is aimed at giant wheel loaders and operations in the most abrasive har
April 23, 2015 Read time: 2 mins
The pewag tycoon chain link offers greater stability and longer life
Possibly the oldest company at INTERMAT - 8072 pewag, whose origins date back to 1479 - showed new chain link designs for its range of tyre protection products and new vertical lifting clamps.

The pewag tycoon ultra-resistant link now features a wider design for greater stability and longer life due to a greater wear surface. The design also reduces the movement between link and ring which contributes to increased lifetime. The tycoon link is aimed at giant wheel loaders and operations in the most abrasive hard rock conditions.

The firm also showed samples of a new chain link it has under development for snow applications. The link has a flat surface on its interior and a round surface on the exterior that prevents chains made with the links from twisting on the tyres to which they are fitted. The new design improves efficiency and durability of chains, says Jean-Marie Monat, commercial manager for pewag France. Also, the grip element of the link now has indentations that provide more surface area to give 7% longer life than previous designs. The links will be available on pewag’s range of snow application chains for winter 2015, says Monat.

The company is also planning to introduce a new range of chain tracks for forestry applications in September 2015.

The pewag winner vertical lifting clamps are designed for lifting and moving steel beams, profiles and structures where the load must stay in position. The special shape of the lifting shackle places the centre of the gravity of the beam beneath the lifting shackle. This maintains the equilibrium of the beam once it has been lifted and keeps the flanges vertical so that the beam can easily be stacked or positioned.

For more information on companies in this article

Related Content

  • Clever approach to reducing bridge vibrations
    November 14, 2013
    Reducing vibrations on a bridge, supplying high-quality binders to emerging countries and helping small and medium players with warm mix, this month’s stories showcase some innovative bitumen technology solutions - Kristina Smith reports The Kessock Bridge in the Highlands of Scotland has become the third bridge in the UK to be resurfaced with Gussasphalt. A dense mastic asphalt containing Nynas Endura N5, a polymer modified binder, Gussasphalt has been designed to have a longer life than standard mastic as
  • Sealing the world's longest tunnel
    April 10, 2012
    Infrastructure construction in China is booming as never before, but sealing the world’s longest immersed tunnel is a technically complex engineering project. The impressive Hong Kong-Zhuhai-Macau fixed link project in China includes an immersed tunnel with a record-breaking length of almost 7km. In 2009 construction began on a project to link the island of Hong Kong with Macau and the mainland Chinese city of Zhuhai. The link will be one of the region’s most technically complex engineering projects ever. I
  • Sealing the world's longest tunnel
    March 21, 2012
    Infrastructure construction in China is booming as never before, but sealing the world’s longest immersed tunnel is a technically complex engineering project. The impressive Hong Kong-Zhuhai-Macau fixed link project in China includes an immersed tunnel with a record-breaking length of almost 7km. In 2009 construction began on a project to link the island of Hong Kong with Macau and the mainland Chinese city of Zhuhai. The link will be one of the region’s most technically complex engineering projects ever.
  • Sealing the world's longest tunnel
    May 8, 2012
    Infrastructure construction in China is booming as never before, but sealing the world’s longest immersed tunnel is a technically complex engineering project. The impressive Hong Kong-Zhuhai-Macau fixed link project in China includes an immersed tunnel with a record-breaking length of almost 7km. In 2009 construction began on a project to link the island of Hong Kong with Macau and the mainland Chinese city of Zhuhai. The link will be one of the region’s most technically complex engineering projects ever. I