CEI Enterprises is now developing a full new line of concrete production plants. This takes the firm, part of Astec Industries, into a new business segment and CEI is working on the engineering required as well as planning its manufacturing and marketing operations for these units. The range will include nine new designs of concrete plants and will include both traditional batch plants and innovative new plant technologies.
January 6, 2017
Read time: 2 mins
179 CEI Enterprises is now developing a full new line of concrete production plants. This takes the firm, part of 681 Astec Industries, into a new business segment and CEI is working on the engineering required as well as planning its manufacturing and marketing operations for these units. The range will include nine new designs of concrete plants and will include both traditional batch plants and innovative new plant technologies. Included in the new innovative technologies will be the conventional concrete, roller compacted concrete (RCC), and cement treated base (CTB) plant designs that had previously been produced by Astec INC. With this technology transfer, Astec INC is exiting the concrete production plant business to focus on a new renewable energy product line and all concrete plant prodution equipment is being moved over to CEI. The firm says that its new concrete plants will feature innovative, technology that will offer new solutions to contractors building heavy civil, airport and highway and projects, providing higher quality concrete at lower production costs.%$Linker: 2Asset<?xml version="1.0" encoding="utf-16"?><dictionary />2126940oLinkExternalwww.CeiEnterprises.comCEI Enterprises webfalse/EasySiteWeb/GatewayLink.aspx?alId=12694falsefalse%>
Lombardini is moving ever closer to offering a 100kW engine as part of its strategy to grow the Kohler KDi series above the 56kW maximum output that currently sits at the top of its range. “We have developed a 3.4litre, four-cylinder engine that will take us to 100kW,” said Lombardini’s marketing and communications manager Nino De Giglio. “The engine is currently being tested and will go into production towards the end of 2014.” De Giglio said the arrival of the new 100kW engine, with its 480Nm of torque, c
Lombardini is moving ever closer to offering a 100kW engine as part of its strategy to grow the Kohler KDi series above the 56kW maximum output that currently sits at the top of its range. “We have developed a 3.4litre, four-cylinder engine that will take us to 100kW,” said Lombardini’s marketing and communications manager Nino De Giglio. “The engine is currently being tested and will go into production towards the end of 2014.” De Giglio said the arrival of the new 100kW engine, with its 480Nm of torque, c
Heatec’s new emulsion mill skid is on display at Conexpo. The skid, designed to produce 54tonnes of emulsified asphalt per hour, includes an asphalt meter system, a latex pump, a control panel, and the new Barracuda colloid mill.
In designing the Barracuda mill, engineers from Heatec examined existing mills to research known drawbacks and see how they could be overcome. One of the features of the mill is the ability to make adjustments while the mill is running. Changing the gap between the jaws is a qu
Heatec’s new emulsion mill skid is on display at Conexpo. The skid, designed to produce 54tonnes of emulsified asphalt per hour, includes an asphalt meter system, a latex pump, a control panel, and the new Barracuda colloid mill.
In designing the Barracuda mill, engineers from Heatec examined existing mills to research known drawbacks and see how they could be overcome. One of the features of the mill is the ability to make adjustments while the mill is running. Changing the gap between the jaws is a qu