Skip to main content

CDE unveils single chassis M5500 sand wash plant

CDE’s new North America market-orientated M5500 sand washing plant is able to produce up to an impressive 550tonnes/hour of washed materials on a single chassis. The M5500 model on show at CONEXPO-CON/AGG 2017 was sold to a major US frac sand supplier only last week.
March 7, 2017 Read time: 2 mins
CDE’s M550 wash plant

3168 CDE Global ’s new North America market-orientated M5500 sand washing plant is able to produce up to an impressive 550tonnes/hour of washed materials on a single chassis.

The M5500 model on show at CONEXPO-CON/AGG 2017 was sold to a major US frac sand supplier only last week.

And Northern Ireland-headquartered CDE is confident that its high volume throughput and optimum efficiency will appeal strongly to North American customers.

Kevin Vallelly, head of product development at CDE, said: “This latest addition to the M-Series combines feeding, screening, washing and stockpiling onto one chassis, and packs an extra punch with unique features. These include a higher capacity of 550 tonnes per hour, a five-product capability and triple pass cyclone sand washing.”

A selection of Infinity screens - CDE’s new development in screening technology - has also been launched onto the North American market, with the P3108 inclined screen, the D164 and the F164 fine materials screen on show this week at the Las Vegas Convention Center.

Adapted to applications in both dry and wet screening situations across a wide range of materials, the new Infinity technology will also be of particular interest to operators looking for sturdier and more economical vibrating screens.

Peter Craven, CDE head of marketing, said: “The customer who bought the M5500 plant on our stand had already bought a 200 tonnes an hour Infinity D164 screen, which we installed as a retrofit to replace one of their ten screens. I think there’s a bit of confidence currently in the North America frac sand industry.”

Meanwhile, CDE has just completed its first US waste recycling-based project after installing a 300tonnes/hour recycling plant for a customer in New Jersey.

A busy Q1 2017 for CDE has also seen the firm appoint Kevin Kelly as president of its North America operations.  

For more information on companies in this article

Related Content

  • Terex Washing Systems set to launch new AggreSand system
    April 3, 2013
    Terex Washing Systems (TWS) is making final plans to unveil what it says is a new innovative washing system. The AggreSand system is the latest addition to what the company says is an already extensive product portfolio, and it is due to be officially launched in Quarter 2, 2013. The TWS AggreSand system combines aggregate washing and screening with sand processing on a modular chassis, and brings together “tried and trusted TWS components in an innovative modular design.”
  • Innovative, efficient aggregate washing system
    February 22, 2012
    Cleaning the crushed and screened products can boost quality and revenue. Aggregate Processing Solutions has developed a novel washing system aimed at the quarrying sector. The APS-100AT has been developed after almost five years of research and development and is said to be an innovative multi-component material washing system, featuring a highly efficient, heavy duty linear multi-deck screen.
  • CONEXPO-CON/AGG 2017 Preview Video
    March 7, 2017
    There are a lot of attractions in Las Vegas, but none of them packs more of a punch than CONEXPO-CON/AGG 2017. Come with us as we push open the doorson the biggest construction equipment show in the world this year. As well as the machines themselves, our experts will talk you through the technology on a walk around. So step inside…
  • CONEXPO-CON/AGG industry education
    July 27, 2016
    The organisers of the CONEXPO-CON/AGG and IFPE exhibition from March 7th-11th 2017 are offering attendees in-depth industry education. In addition to exhibits, CONEXPO-CON/AGG and IFPE 2017 will feature, flexible education ticket options to fit attendee needs and schedules. Attendees will also have access to the new 6,970m2 Tech Experience area, which will showcase ideas and technologies to transform the future of construction, boosting safety, productivity and profitability. The organisers are also offe