Skip to main content

Caterpillar's milling and loading advances

Caterpillar is broadening the range of applications for its PM200 milling machines as well as offering a new tracked loader model. The PM200 milling machine can now be fitted with a 2.2m wide milling drum for special wide cutting applications.
February 15, 2012 Read time: 2 mins
Caterpillar's PM200 milling machine can now be fitted with a 2.2m wide milling drum for special wide cutting applications
178 Caterpillar is broadening the range of applications for its PM200 milling machines as well as offering a new tracked loader model. The PM200 milling machine can now be fitted with a 2.2m wide milling drum for special wide cutting applications. The new 2.2m drum is said to offer high efficiency and productivity by reducing passes. Making fewer passes will also help cut fuel consumption. The standard 2m drum however best suits duties in urban applications and milling tasks that require a high degree of manoeuvrability and precision. The PM200 weighs in at 30.9tonnes when fitted with the standard 2m rotor package and its weight increases to 31.5tonnes when the optional 2.2m drum package is installed. There is also an optional dust-reduction package available for PM200 machines equipped with the 2.2m rotor option. This includes an additional water pump as well as additional spray bars located inside the rotor housing and conveyors.

Caterpillar also continues to develop its tracked loader range with the introduction of the 973D. This 28tonner completes the firm's D-Series and features load-sensing hydraulics, joystick steering and a new operator's station with a tilting cab that offers good access for maintenance. Productivity is improved due to the more efficient hydraulics as well as a drive-train that provides 10% more power than the previous 973C model. The machine retains the Cat C9 engine, hydrostatic drive, single-fabrication mainframe, Z-bar loader linkage and oscillating undercarriage from the earlier generation model but benefits from a load-sensing hydraulic system with a new closed centre design. Key to the hydraulics is a variable-displacement pump that supplies the precise volume of oil required for the load on the system, cutting fuel consumption and also leaving more engine power to drive the tracks. The system also allows better simultaneous functions of lift, tilt and travel.

For more information on companies in this article

Related Content

  • US asphalt and quarry show highlights new technology
    May 8, 2015
    New technology was one key focus area for the World of Asphalt/AGG1 event run recently in the US city of Baltimore - Mike Woof writes Technology has been a major focus for the combined World of Asphalt and AGG1 2015 exhibition and conference held in Baltimore. The exhibition area attracted 450 exhibitors and covered a larger area than for previous events, while over 10,000 education season tickets were bought by those wanting to attend the presentation sessions. The event was held from March 17th- March
  • Caterpillar offers improved backhoe loader range
    April 10, 2015
    Caterpillar aims to capture new customers with its latest generation of backhoe loaders. Versatile, durable, productive, reliable and highly mobile, these machines can be used with a wide array of attachments and tools to handle an even wider range of tasks on construction sites. The new F2-Series machines, 427F2, 428F2, 432F2, 434F2, and 444F2, take over from the proven F-Series. These revamped models feature an all-new cab as well as the latest low emission, low noise engine technology. These more effi
  • Simex goes big compact with PL 2000 planer
    November 9, 2022
    Simex is now offering its largest compact planer attachment.
  • Tandem solution for Cape Town road
    July 6, 2012
    Cape Town's N2 is a strategic South African highway that connects the port city with the country's southwestern region. Due to increasingly heavy traffic on the highway, it was in need of an upgrade, and fast. So one of Cape Town's largest contractors, Vusela, was awarded the government contract to remove the asphalt layers and stabilise the sub-base to strengthen the road's load capacity in preparation for resurfacing.