Skip to main content

Case equipment helps rebuild local communities after floods

The floods and burst riverbanks suffered last spring throughout Europe have highlighted once again the importance of having the right equipment at the right time. In Germany and more recently in Spain, Case equipment is said to have been indispensable during recovery work in flood-damaged areas. During June, roads, bridges, homes and forest trails in many urban areas were affected by the heavy rain that led to flooding throughout northern Spain’s entire Aran Valley (Lleida), and the overflowing of the Ga
September 26, 2013 Read time: 3 mins
The floods and burst riverbanks suffered last spring throughout Europe have highlighted once again the importance of having the right equipment at the right time. In Germany and more recently in Spain, 176 Case equipment is said to have been indispensable during recovery work in flood-damaged areas.

During June, roads, bridges, homes and forest trails in many urban areas were affected by the heavy rain that led to flooding throughout northern Spain’s entire Aran Valley (Lleida), and the overflowing of the Garona river on its way through the town of Vielha. The emergency situation was dealt with quickly and the water had barely begun to recede when the first Case equipment turned up to help.

Following the worst of the flooding, a large amount of Case equipment is continuing to help in repairing the damage, in an attempt to help the thousands of affected inhabitants return to normal. Case equipment could be seen over the whole area, particularly heavy line equipment, but also some mini equipment. The 621E, 621D, 821F, 821C, 821E large loading shovels; the CX240B, CX290B, CX300C, CX350C and CX370C excavators; and the CX31 compact were fully operational in the area, together with the 430 mini-loader and the WX185 and WX210 wheeled excavators.

This was confirmed by Teo Cambra, head of sales for Simorra, the Case distributor in Lleida, the area affected by the disaster. “Two of our clients are working with their Case equipment in the various areas affected, and for this reason they have reinforced their fleets by renting a few more machines from Simorra," said Cambra.

Simorra has rented four machines. The first of these was an 821F loader to the company Excor, who work for another firm, 3373 Endesa, on the rebuilding of a collapsed bridge at the mini electrical power station in the badly flood-damaged town of Arties. This loader was used in conjunction with a Case CX240C excavator.

Construcciones del Pirineo 2001 has placed its Case fleet (WX185, 621E and 430) at the service of Aran town council, the Spanish government body overseeing the Aran Valley. It has been working since the beginning on rebuilding the entire area with the help of a Case CX370C, also rented from Simorra.

Cambra added, “We have also rented a CX290B and a CX300C to two private subcontractors that are also helping to repair the damage caused.”

Case equipment has also been an enormous help in the floods seen in south-east Germany during early June. The new Case dealership in Erlangen, recently opened in the town located in the federal state of Bavaria, swiftly dispatched an excavator and loader to the Bavarian town of Deggendorf, one of the areas worst affected by the floods.

Case also donated €5,000 to one of the affected families in this town. The manager of the dealership, Peter Straßer, awarded a cheque to a representative of the Red Cross in Bavaria during the opening of the new Erlangen facility. On the same day the company NMB, a Case supplier specialising in attachments, also made a spontaneous contribution, providing a demolition tool to be used with the Case equipment in Deggendorf.

The Simorra group, based in Lleida, Spain, is formed by the companies Simorra and Maquinsa. It consists of a team of 65 qualified professionals, with proven experience in the sector. The group's facility is 11,000m², fitted with the latest technology, and possesses over 600m² for display and spare parts.

For more information on companies in this article

Related Content

  • New Angolan bridge offers improved connectivity
    September 30, 2013
    Drivers in Angola are benefiting from a bridge that spans the Catumbela River, taking the place of an old structure that had proven not fit for purpose. The US$35 million cable stayed bridge is located in the highway between Benguela and Lobito, around 7km from Angola’s Atlantic coast and is one of a series of new infrastructure developments in the country. Angola suffered a long period of war that impacted on its people and infrastructure. The war resulted in severe damage to the country’s road system alon
  • Evonik’s Degaroute boosts Medellin cycle path safety
    January 25, 2017
    Across Latin America, a region known for its chaotic driving and dense traffic jams, a growing number of commuters are doing the unthinkable - ditching their cars for bicycles City leaders and cycling advocates in Latin America have recently been focusing on the development of sustainable urban design that improves cyclist. Hundreds of kilometres of bike lanes are being laid out and cyclists are getting favourable loans to purchase bikes. There are even innovative bike-share systems. One city enhancin
  • Road rage pachyderm
    May 26, 2016
    In India an elephant in distress caused damage to numerous vehicles in the town of Siliguri in East Bengal. The animal entered the town from the nearby Baikunthapur forest and became alarmed by the throng of human activity around it. As it barged its way through the town leaving a trail of destruction in its wake, locals watched in horror from a safe distance. Experts were brought in to fire tranquiliser darts at the elephant, which was then transported to more suitable surroundings to recover from its orde
  • Kontent Structures has it covered
    October 15, 2021
    Renovation on a bridge over the Rhine River in Karlsruhe, Germany, has been completed using a weather-resistant tent covering the entire length of the structure