Skip to main content

Case 580ST backhoe loader has new in-line cylinder geometry

Case Construction Equipment is extending its backhoe loader offering with the introduction of a new backhoe design with in-line cylinder geometry and inner extendahoe on its 580ST model. Customers now have two choices, with one being the new in-line geometry, with better visibility and great breakout forces. The other choice is the well-known CASE boom with overlapping cylinders and outer extendahoe. This has a shorter boom, lower transport height and protected outer sliding extendahoe. The new in-li
March 4, 2016 Read time: 2 mins
Case 580ST has new in-line geometry
176 Case Construction Equipment is extending its backhoe loader offering with the introduction of a new backhoe design with in-line cylinder geometry and inner extendahoe on its 580ST model.

Customers now have two choices, with one being the new in-line geometry, with better visibility and great breakout forces. The other choice is the well-known CASE boom with overlapping cylinders and outer extendahoe. This has a shorter boom, lower transport height and protected outer sliding extendahoe.

The new in-line geometry, which maintains the S shape boom, ensures that the effort is evenly distributed over the entire length of the boom, resulting in high stress resistance. The narrower frame of the boom provides better visibility of the working area at the back of the machine.

Operators looking for exceptional breakout force and great reach will find it all in the new in-line boom. Breakout force is 5,520daN both at the bucket and at the dipperstick and the boom reaches as far as 6,647mm from the swing centre.

The booms geometry with outer extendahoe means the sliding part never touches the soil, while the components that do touch the ground are protected against impact and material accumulation.

The design with overlapping cylinders reduces the 580ST’s overall boom transport height to just 3.5m, making it easy to transport. More time is saved with the patented integrated hydraulic quick coupler, which allows the operator to change backhoe attachments from the cab with the simple flick of a switch.

For more information on companies in this article

Related Content

  • Latest developments in construction machines
    April 4, 2012
    High performance backhoe loaders from Hidromek can compete with leading brands on performance - Mike Woof reports Turkish manufacturer Hidromek is looking to take a larger slice of the international market with its newly upgraded backhoe loader models. The firm currently sells machines in 50 countries worldwide and intends to boost its market profile. Marketing manager Levent Karaa aç said, "We will be a global brand." This family owned firm has come a long way since it was founded in 1978, manufacturing a
  • Key innovations in engines and drivelines technology at Conexpo 2014
    April 22, 2014
    Engines and drivelines technologies have move forward, as could be seen at Conexpo 2014 - Geoff Ascroft reports Solutions for Tier 4 Final emissions regulations dominated Conexpo 2014, with many firms showing off their options of DOC, DPF and SCR after-treatments. Deutz, while staying with an SCR-only solution, took a more unusual approach on its high horsepower V6 12litre and V8 16litre engines. Both get a dual SCR after treatment system to meet Tier 4 Final emission standards. Using a dual SCR system,
  • Latest developments in construction machines
    February 14, 2012
    High performance backhoe loaders from Hidromek can compete with leading brands on performance - Mike Woof reports
  • Europe’s first Hyundai R1200-9 excavator debuts in Luxembourg
    December 15, 2017
    Démolition et terrassement XL Sàrl from Nidderkuer, Luxembourg, has been using the largest capacity Hyundai excavator, the R1200-9, in Luxembourg City centre. The R1200-9, which has an operating weight of 120tonnes, started in March in the city’s financial heart on the site of the soon-to-be Bank of China complex. The huge excavator is breaking reinforced concrete foundations with a 7tonne hydraulic breaker. The first task to complete is a 35m-deep, 6-storey underground parking area.