Skip to main content

California delays emissions regulations

In the US state of California, legislators have now decided to delay tough regulations on emissions from construction equipment fleets. In California construction firms with large machine fleets were preparing themselves for having to re-engine older machines, buy new equipment or risk losing contracts.
February 23, 2012 Read time: 3 mins
In the 972 US State of California, legislators have now decided to delay tough regulations on emissions from construction equipment fleets. In California construction firms with large machine fleets were preparing themselves for having to re-engine older machines, buy new equipment or risk losing contracts.

The California Air Resources Board has now said it will allow companies more time to comply with the tough emissions targets, because construction activity in the state has dropped by some 50% since the regulations were announced three years ago. This drop has reduced engine emissions. The legislators are now considering how the construction industry can meet California’s stated aim of cutting diesel emissions by 2014, the date required to meet federal clean air standards.

However although economic factors have been given as the main reason for reviewing the emission rules, the legislators have also admitted that they had overestimated the air pollution caused by construction equipment as well as buses and trucks.

An examination of the figures has revealed that California has around 200,000 fewer construction machines than the regulators had originally calculated. As a result, it had been assumed construction machines in the state were producing anything from 50-80% more exhaust emissions. This piece of information has attracted strong criticism from the industry, which has been requesting better data on the quantities of exhaust emissions from California’s construction machines. As a result the construction industry is now calling for a five year delay of the emissions regulations.

The rules were passed in 2007 and require diesel driven construction equipment to be replaced, re-powered or fitted with emissions capturing systems over the next 15 years. Large fleets have until 2020, while fleets with less than 20 machines have until 2025.

And nor is such a mistaken use of data confined to California. Similar low emission regulations were considered for construction machines operating in UK capital London some years ago. Regulators proposed the introduction of rules that would require only new construction machines featuring the latest low exhaust emissions/noise technology to be used within the city’s low emissions zone. Many construction machines were also to have been fitted with after-treatment systems to further cut particulates as well as NOx. However after some discussion it soon transpired that the emissions levels from construction equipment claimed by those wanting to introduce the regulations were wrong. A simple check of the arithmetic revealed basic errors that would embarrass a school child.

Clearly old diesel driven construction machines can have high exhaust emissions levels that may be unacceptable for use in many urban operations. However regulators should learn not to make judgements using incorrect data.

For more information on companies in this article

Related Content

  • WASH AND GO
    February 9, 2018
    Our Skidmarks page is highly rated by readers. Your input could help make this page even more entertaining. If you come across any amusing road-related stories or pictures email me at [email protected]
  • India’s infrastructure programme continues
    October 26, 2020
    The Indian Government continues to show high levels of aggressiveness for developing its road infrastructure.
  • Recycling advances from Wirtgen
    June 18, 2012
    German firm Wirtgen is retaining its lead in road recycling technologies – Mike Woof writes Tests on cold recycling with a new layer thickness using Wirtgen's sophisticated WR 4200 machine have shown impressive results according to the firm. The road construction and traffic authority Landesbetrieb Mobilität (LBM) Cochem-Koblenz commissioned a pilot project as part of its plan to optimise the cold in-place recycling process (CIR). The aim was to examine the extent to which the layer thickness can be reduced
  • Auckland Harbour bridge celebrates 50 years
    February 22, 2012
    The bridge over Auckland Harbour celebrates its half century this year, and it has been given a major upgrade to ensure that safety is maintained in New Zealand's largest city. Mary Searle reports. Auckland is New Zealand's largest city, home to nearly a third of the entire country's population. It's a sprawling metropolis, and its 1.3 million people are spread over 637km² of city, suburbs and islands. The Auckland Harbour Bridge, which celebrates its 50th birthday in May, is a vital link in the city's road