Skip to main content

Building blocks

Police in the West Virginia were forced to close highway lanes on a key route in the state, due to a spillage of Lego building blocks. The Lego fell from a container being carried on top of a car as a family made a Sunday afternoon trip. High winds lifted the top of the container and the driver and her son quickly realised the Lego was spilling into the roadway of I-79. Police were called and they closed several lanes to allow highway to pick up the building blocks. The mother of the 11-year-old apologised
May 24, 2013 Read time: 1 min
Police in the West Virginia were forced to close highway lanes on a key route in the state, due to a spillage of Lego building blocks. The Lego fell from a container being carried on top of a car as a family made a Sunday afternoon trip. High winds lifted the top of the container and the driver and her son quickly realised the Lego was spilling into the roadway of I-79. Police were called and they closed several lanes to allow highway to pick up the building blocks. The mother of the 11-year-old apologised for the delays caused by the incident.

Related Content

  • Seattle’s Alaskan Way tolls to be kept to a minimum
    June 4, 2018
    Drivers could pay as little as US$1 to use Seattle’s 2.7km Alaskan Way tunnel when it opens, likely by the end of the year. The Washington State Department of Transportation, owner of the tunnel, are considering several rates depending on time of day and day of week, according to local media. The DoT said funding for the $3.2 billion viaduct replacement programme comes from state, federal and local sources as well as the Port of Seattle and tolls on drivers using the tunnel. The money will fund tunnel
  • Seattle’s Alaskan Way tolls to be kept to a minimum
    June 4, 2018
    Drivers could pay as little as US$1 to use Seattle’s 2.7km Alaskan Way tunnel when it opens, likely by the end of the year. The Washington State Department of Transportation, owner of the tunnel, are considering several rates depending on time of day and day of week, according to local media. The DoT said funding for the $3.2 billion viaduct replacement programme comes from state, federal and local sources as well as the Port of Seattle and tolls on drivers using the tunnel. The money will fund tunnel
  • Wirtgen machines help with road recycling in Italy
    March 18, 2016
    One of the first Wirtgen W 200 Hi cold milling machines off the assembly line is now being used for road recyling work in southern Europe. The versatility of the machine due to its novel 400mm offset drum capability has proven extremely useful for the contractor in Italy. Tuscany–based Endi Asfalti is now using the large and highly productive W 200 Hi for a wide range of milling jobs that would previously have been carried out using a combination of large and small milling machines. The proven W 200 milling
  • New version of world’s longest floating bridge
    August 12, 2014
    The creation of a new version of the world’s longest floating bridge in Seattle, in the US state of Washington, is among the world’s most eye-catching current bridge engineering projects. It is an impressive example of the health of the bridge replacement sector, particularly in the US, leaving it well placed for growth. Guy Woodford reports Already the world’s longest floating bridge at over 2,310m long, the Governor Albert D Rosellini-Evergreen Point Floating Bridge in Seattle in the United States is g