Skip to main content

Bridge down

Thieves in Turkey recently stole a bridge, which is then thought to have been cut up for scrap. The 25m long bridge weighed 22tonnes and was located close to a small village in Turkey’s western province of Kocaeli. When villagers realised the bridge had disappeared they called police who quickly ascertained that the structure had been cut to piece and hauled away for scrap. This follows a similar incident in India when a steel bridge was stolen by enterprising thieves, who convinced locals with forged docum
May 24, 2013 Read time: 1 min
Thieves in Turkey recently stole a bridge, which is then thought to have been cut up for scrap. The 25m long bridge weighed 22tonnes and was located close to a small village in Turkey’s western province of Kocaeli. When villagers realised the bridge had disappeared they called police who quickly ascertained that the structure had been cut to piece and hauled away for scrap. This follows a similar incident in India when a steel bridge was stolen by enterprising thieves, who convinced locals with forged documents that a steel bridge was due for demolition before cutting it apart and taking it away for scrap.

Related Content

  • New German bridge - cost increase
    September 5, 2022
    An important new German bridge is seeing a cost increase.
  • Rebuilding a historic bridge linking the US and Canada
    March 8, 2016
    While many road authorities in North America are finding it difficult to stretch their bridge assets beyond half a century, one bridge is closing in on its centenary - David Arminas reports The international Peace Bridge, connecting the Canadian province of Ontario with the US state of New York, is 88 years young this year, and still going strong.
  • Long reach equipment simplifies demolition
    February 14, 2012
    Demolition is a highly specialised business, as the machinery required to carry out the work on high-rise demolition contracts can be very site specific. Today's high reach demolition rig is no longer simply a tracked excavator with a long boom, indeed some machines cannot be used as excavators at all. Likewise a machine that is dedicated to carrying a 2.5 or 3tonne shear or hammer will need to be built to take the stresses and strains of demolition life.
  • Long reach equipment simplifies demolition
    April 13, 2012
    Demolition is a highly specialised business, as the machinery required to carry out the work on high-rise demolition contracts can be very site specific. Today's high reach demolition rig is no longer simply a tracked excavator with a long boom, indeed some machines cannot be used as excavators at all. Likewise a machine that is dedicated to carrying a 2.5 or 3tonne shear or hammer will need to be built to take the stresses and strains of demolition life. Many of the ultra long boom machines are designed