Skip to main content

Bridge down

Thieves in Turkey recently stole a bridge, which is then thought to have been cut up for scrap. The 25m long bridge weighed 22tonnes and was located close to a small village in Turkey’s western province of Kocaeli. When villagers realised the bridge had disappeared they called police who quickly ascertained that the structure had been cut to piece and hauled away for scrap. This follows a similar incident in India when a steel bridge was stolen by enterprising thieves, who convinced locals with forged docum
May 24, 2013 Read time: 1 min
Thieves in Turkey recently stole a bridge, which is then thought to have been cut up for scrap. The 25m long bridge weighed 22tonnes and was located close to a small village in Turkey’s western province of Kocaeli. When villagers realised the bridge had disappeared they called police who quickly ascertained that the structure had been cut to piece and hauled away for scrap. This follows a similar incident in India when a steel bridge was stolen by enterprising thieves, who convinced locals with forged documents that a steel bridge was due for demolition before cutting it apart and taking it away for scrap.

Related Content

  • Special purpose add-ons for demolition excavators
    February 16, 2012
    Long reach demolition excavators are now special purpose machines, Dan Gilkes reports. The majority of construction equipment manufacturers offer a range of demolition specific machines, built to meet the needs of a sector of the industry that works its plant harder than most.
  • Special purpose add-ons for demolition excavators
    April 13, 2012
    Long reach demolition excavators are now special purpose machines, Dan Gilkes reports The majority of construction equipment manufacturers offer a range of demolition specific machines, built to meet the needs of a sector of the industry that works its plant harder than most. Reinforced structures, additional hydraulic services, cab and body protection, dust suppression and additional engine air cleaners are just some of the standard alterations required by the demolition contractor. For many years exca
  • Building a replacement bridge in record time
    March 13, 2023
    The construction of a new bridge in Pittsburgh, Pennsylvania to replace a collapsed structure has been carried out in record time
  • Crane lifts in bridge structure in Germany
    December 14, 2015
    A Terex crawler crane has been used to lift out a concrete bridge in the German town of Zweibrücken. The work was carried out shortly after the Terex Superlift 3800 lattice boom crawler crane had been supplied to Trier-based specialist Steil. The crane hire firm already had four Terex crawler cranes in its fleet with this new arrival bringing the number to five. The machine had a particularly short journey to make to the job site as it had just been manufacturerd at the Terex facility located in Zweibrü