Born to roam, the Bison concrete batch plant from Simem

Like the wild bison of North America, this Bison from Italian manufacturer Simem can roam from place to place because it is “hyper mobile”. And when it is not roaming, it can produce up to 500 tonnes an hour, making it suitable for large civil works such as dams, airports and tunnel work.
April 14, 2016 Read time: 1 min
Born to roam: the Bison concrete batch plant from Simem
Like the wild bison of North America, this Bison from Italian manufacturer 2595 Simem can roam from place to place because it is “hyper mobile”.

And when it is not roaming, it can produce up to 500 tonnes an hour, making it suitable for large civil works such as dams, airports and tunnel work.

This trailer-mounted plant takes around four hours to install and needs no cranes, said Christopher Bennett, commercial director for UK-based HS Services – the company appointed by Simem as UK & Ireland dealer and installer for batching plant and mixers.

The main trailer consists of a twin-shaft mixer, 1-2 aggregates, powder and liquid dosing devices and loading belt. Importantly, it has a low profile - making it even more mobile for getting to sites with difficult access conditions and also for working on sites with height restrictions.

The Bison can be used with any aggregates trailer, power trailer and service trailer.

For more information on companies in this article

Related Content

  • SDLG wheeled loaders assisting in Georgia’s concrete production
    March 13, 2015
    A fleet of wheeled loaders from SDLG is playing a key link in the chain for producing concrete at a facility in Georgia. With this equipment HeidelbergCement Georgia and HeidelbergBeton Georgia are proving able to keep pace with an intensive production schedule at a number of concrete production sites across Georgia. Overall HeidelbergCement Caucasus has seven concrete and two cement manufacturing plants in Georgia that are running SDLG wheeled loaders. The company’s SDLG fleet comprises LG936L, LG953 and L
  • Brisbane’s Airport: Innovative Management of One of the World’s Busiest Runways
    June 26, 2014
    When it comes to runways, there are few busier then Brisbane’s main runway. Servicing both domestic and international travel, with over 200,000 movements per year, operating without a curfew Brisbane’s main runway is the busiest in Australia. For maintenance, crews only have a limited period of time to determine the pavement condition, normally during the night, making the detection of pavement faults difficult. To resolve this issue, a new high speed pavement scanner was used to rapidly survey the pavem
  • Tunnelling challenge on German project
    June 13, 2012
    A massive construction project has been underway deep in the heart of the Schnecktal valley area in Germany. From the surface, though, you would never be able to tell. The majority of the work is underground, as a joint-venture team led by German contractor Wayss and Freytag Ingenieurbau builds the nearly 7km long Finne Tunnel. After a few years of tunnel boring operations, the contractor is at work finishing the interior of the tunnel, slipforming first the tunnel’s floor and then a walkway with its GOMACO
  • Cold recycling helps rebuild of Brazil’s Ayrton Senna highway
    September 28, 2015
    Brazil’s Ayrton Senna Highway has been rebuilt using cold recycling. Brazil’s SP-070 is also known as the Ayrton Senna Highway and is a major highway in the country, carrying heavy traffic volumes. For its rebuild, the time-saving, cost-efficient and eco-friendly benefits of the cold recycling process have been put to the test. The SP-070 provides a key transport link between São Paulo and Campos do Jordão, Vale do Paraíba and Rio de Janeiro, as well as being the main access route to Guarulhos Interna