Skip to main content

BOMAG’s latest highway class paver upgrade

New operating features for the BOMAG BF 800 C-2 paver are said to help increase its output and efficiency when working onsite. An important development is the new traffic light system, which helps improve communications between the paver operator and the asphalt delivery truck driver. This ensures a more even supply of material into the hopper and tells the truck driver when it is full. Some proven features have been retained, such as the high quality screeds, which benefit from a long and heavy design, th
April 26, 2018 Read time: 1 min
BOMAG’s revamped BF 800 paver offers new capabilities

New operating features for the 172 BOMAG BF 800 C-2 paver are said to help increase its output and efficiency when working onsite. An important development is the new traffic light system, which helps improve communications between the paver operator and the asphalt delivery truck driver. This ensures a more even supply of material into the hopper and tells the truck driver when it is full.

Some proven features have been retained, such as the high quality screeds, which benefit from a long and heavy design, the company insists. Jonathan Stringham, vice president of marketing at BOMAG explained: “It has the heaviest screeds with the longest smoothing surfaces in its class.”

For more information on companies in this article

Related Content

  • High production paving
    February 28, 2012
    In Germany a high production paving operation has been achieved using the largest machine available on the market. This project is all the more notable as the operation has been carried out in a continuous process, without joints. The Vögele SUPER 3000-2 paver was able to advance continuously at a rate of almost 4m/min. The machine was preceded by a bustle of activity, for no fewer than 24 feed lorries were needed to ensure an uninterrupted supply of mix to the paver, which placed an even asphalt surfacing
  • Asphalt plant innovations
    June 14, 2019
    New developments in asphalt plant technology are offering better cost efficiency and materials quality for the industry
  • Caterpillar Paving offers a guide to efficient night time paving practices
    October 3, 2014
    Efficient night-time paving operations can reduce construction costs and cut traffic delays - *Todd Mansell writes As roads become more congested, the user cost of daytime lane closures to accommodate road construction and paving has increased dramatically. One solution to lower user costs associated with traffic delays is to carry out more paving at night during off-peak times. However night-time paving brings new challenges to producing quality work in safely.
  • Bomag comes in first
    November 23, 2021
    Bomag equipment was essential for constructing the Mandalika circuit, according to R3, the project’s asphalt technical consultant.