Skip to main content

BOMAG’s latest highway class paver upgrade

New operating features for the BOMAG BF 800 C-2 paver are said to help increase its output and efficiency when working onsite. An important development is the new traffic light system, which helps improve communications between the paver operator and the asphalt delivery truck driver. This ensures a more even supply of material into the hopper and tells the truck driver when it is full. Some proven features have been retained, such as the high quality screeds, which benefit from a long and heavy design, th
April 26, 2018 Read time: 1 min
BOMAG’s revamped BF 800 paver offers new capabilities

New operating features for the 172 BOMAG BF 800 C-2 paver are said to help increase its output and efficiency when working onsite. An important development is the new traffic light system, which helps improve communications between the paver operator and the asphalt delivery truck driver. This ensures a more even supply of material into the hopper and tells the truck driver when it is full.

Some proven features have been retained, such as the high quality screeds, which benefit from a long and heavy design, the company insists. Jonathan Stringham, vice president of marketing at BOMAG explained: “It has the heaviest screeds with the longest smoothing surfaces in its class.”

For more information on companies in this article

Related Content

  • Cost-saving benefits of dual layer asphalt paving
    February 14, 2012
    Sophisticated dual layer paving technologies currently on the market are said to offer major advantages to road builders. Roads built using twin layer, hot on hot paving techniques can last considerably longer than those constructed using conventional methods. Contractors and clients also stand to gain from savings on materials costs, through the elimination of the need for emulsion spraying between binder and wearing courses and with the use of thin layer wearing course designs. At present two paver man
  • Wirtgen paving technology takes off at Frankfurt
    February 27, 2017
    Time was at a premium for Wirtgen machinery when resurfacing the runway at Frankfurt/Main Airport Europe’s third largest airport, Frankfurt/Main, has new surface course on runways about every seven year, including the centre runway, the most-frequently used section.
  • Micro surfacing the Brooklyn Bridge with Bergkamps’ M210 paver
    May 16, 2018
    A major job for micro surfacing took place on the Brooklyn Bridge near New York. It was the third time in Ken Messina’s career that he would provide micro surfacing for the iconic Brooklyn Bridge, built in 1883. Messina, as president of New Jersey-based Asphalt Paving Systems (APS), knew only too well the challenges that lay ahead. And there were many. There would be only a brief window of opportunity for paving, with lane closures starting at 10pm and ending at 5am. The cool, humid atmosphere would a
  • BOMAG’s latest stabilisers: RS 250 and RS 300
    May 19, 2022
    Tractor-towed stabilisers are a new addition to BOMAG's product range – the RS 250 and RS 300.