Skip to main content

Board dog

A bulldog called Otto has set a new world record for skateboarding. The animal was able to keep its skateboard in full control as it passed underneath a human tunnel comprising 30 people. The record attempt was set in Peru.
May 10, 2016 Read time: 1 min

A bulldog called Otto has set a new world record for skateboarding. The animal was able to keep its skateboard in full control as it passed underneath a human tunnel comprising 30 people. The record attempt was set in Peru. The owners of the three-year-old animal were inspired by the feats of skill by another skateboarding bulldog, which died earlier this year.

Related Content

  • CECE urges harmonisation of Europe’s machine control technologies
    September 25, 2015
    At their joint summit, held in Brussels, Belgium, the presidents of CECE (Committee of European Construction Equipment) and CEMA (European Agricultural Machinery Association) presented to EU institutions a manifesto consisting of five priority actions for a successful digital transformation of the construction and the agricultural machinery industries.
  • JCB celebrating 70th anniversary
    October 21, 2015
    UK construction equipment manufacturer JCB is celebrating its 70th anniversary. The firm was founded on October 23rd, 1945 by the late Joseph Cyril Bamford in a lock-up garage in the Staffordshire market town of Uttoxeter. It was the same day as his son Anthony, now Lord Bamford, was born and as Mr Bamford remarked “being presented with a son tended to concentrate the mind and when you were starting at the bottom, there was only one way to go and that was up.” The foundation for the growth that was to
  • New York tunnels upgrade complete
    June 9, 2022
    Upgrade work is complete for New York’s key tunnel links.
  • Transylvanian motorway breaks new ground in engineering
    July 11, 2012
    Normally in hilly ground, we would use the excavated soil from the cuttings to fill the valleys," says Bogdan Sgarcitu, External Affairs Manager of construction company Bechtel. "But on this stretch the clay-like soil cannot be compacted, so we've had to use many more piles than normal: in just three months we installed more than 500, some drilled as deep as 24m. We've also had to transport millions of tonnes of materials over some less-than-perfect infrastructure."