Skip to main content

BIM pilot project for Peri in Germany

Peri is showcasing one of its latest contract wins on its stand at bauma 2016 as part of a focus on projects which aims to demonstrate the company’s wider capabilities. The formwork specialist recently won a contract with joint venture contractor Max Bögl / Porr on the Filstal railway bridge, a pilot project for the use of building information modelling (BIM). The Filstal bridge, which is on the new high-speed line between Stuttgart and Ulm, is one of four projects chosen by Germany’s Federal Ministry of Tr
April 12, 2016 Read time: 2 mins
The Filstal railway bridge is one of four BIM pilot infrastructure projects in Germany

298 Peri is showcasing one of its latest contract wins on its stand at bauma 2016 as part of a focus on projects which aims to demonstrate the company’s wider capabilities. The formwork specialist recently won a contract with joint venture contractor Max Bögl / Porr on the Filstal railway bridge, a pilot project for the use of building information modelling (BIM).

The Filstal bridge, which is on the new high-speed line between Stuttgart and Ulm, is one of four projects chosen by Germany’s Federal Ministry of Transport and Digital Infrastructure (BMVI) to investigate the benefits of BIM. The foundations for the bridge are in place, with Peri currently working on the designs for the pier formwork.

Used to some extent in markets including the UK and US, BIM is a fast-developing technology that Peri expects to spread to other global markets. “BIM is a big topic for us: in the future companies will use BIM technology more and more,” said Peri marketing specialist Martina Pankoke.
Peri’s head of engineering tools & innovation, Jochen Köhler, hopes that BIM will help improve safety as well as bringing time efficiencies through clash detection, which is a more generally understood benefit of BIM. “We want to provide a check list for the climbing formwork so that the person responsible knows exactly what needs to be checked before anyone goes on that scaffold,” said Köhler.

The BIM safety feature would see information such as a check list, assembly information and a sign-off form attached to the BIM model. Other related developments could include the use of QR codes on bespoke elements that would inform the formwork contractor where the element should go, and how it would be installed.

Köhler sees the shift from current practices to the use of BIM as a significant one, comparable to the move from hand-drafted designs to CAD.

“We don’t know how we will be working with BIM in five years, no one knows, but we do know that we have to start now,” he concluded.

For more information on companies in this article

Related Content

  • More satellites, more signals
    July 20, 2012
    Greater GPS accuracy suggests closer tolerances for surveying and machine control functions What happens in the future for GPS surveying and machine control could depend on satellite choice and signals. Right now there are around 30 satellites in orbit, largely built by the US, but by 2012 that could rise to 120 as Europe, China, India and Russia fully enter the market. A chequered history has faced the European's Galileo system. At long last, the finance appears to be in place and the European Commission a
  • ULMA's complete climbing solutions
    June 1, 2021
    ULMA's complete climbing solutions provides forming, climbing, and safety in a single product line
  • Deciding whether to buy new or used equipment
    May 20, 2015
    Customers can face the choice of buying used or new equipment – Dan Gilkes writes. The decision to buy either new or used equipment is almost as old as the construction plant market itself. However some of the reasons for choosing between the two might well be changing, to meet new demands from customers across the world and to cope with a changing supply base. Ever more stringent emissions legislation in Europe, the US and Japan, rapidly developing emerging markets that want the productivity of the latest
  • Smartphone solutions assure paving quality at a lofty height
    April 1, 2022
    Road construction project with digital documentation and temperature monitoring by Vögele