Skip to main content

BIM pilot project for Peri in Germany

Peri is showcasing one of its latest contract wins on its stand at bauma 2016 as part of a focus on projects which aims to demonstrate the company’s wider capabilities. The formwork specialist recently won a contract with joint venture contractor Max Bögl / Porr on the Filstal railway bridge, a pilot project for the use of building information modelling (BIM). The Filstal bridge, which is on the new high-speed line between Stuttgart and Ulm, is one of four projects chosen by Germany’s Federal Ministry of Tr
April 12, 2016 Read time: 2 mins
The Filstal railway bridge is one of four BIM pilot infrastructure projects in Germany

298 Peri is showcasing one of its latest contract wins on its stand at bauma 2016 as part of a focus on projects which aims to demonstrate the company’s wider capabilities. The formwork specialist recently won a contract with joint venture contractor Max Bögl / Porr on the Filstal railway bridge, a pilot project for the use of building information modelling (BIM).

The Filstal bridge, which is on the new high-speed line between Stuttgart and Ulm, is one of four projects chosen by Germany’s Federal Ministry of Transport and Digital Infrastructure (BMVI) to investigate the benefits of BIM. The foundations for the bridge are in place, with Peri currently working on the designs for the pier formwork.

Used to some extent in markets including the UK and US, BIM is a fast-developing technology that Peri expects to spread to other global markets. “BIM is a big topic for us: in the future companies will use BIM technology more and more,” said Peri marketing specialist Martina Pankoke.
Peri’s head of engineering tools & innovation, Jochen Köhler, hopes that BIM will help improve safety as well as bringing time efficiencies through clash detection, which is a more generally understood benefit of BIM. “We want to provide a check list for the climbing formwork so that the person responsible knows exactly what needs to be checked before anyone goes on that scaffold,” said Köhler.

The BIM safety feature would see information such as a check list, assembly information and a sign-off form attached to the BIM model. Other related developments could include the use of QR codes on bespoke elements that would inform the formwork contractor where the element should go, and how it would be installed.

Köhler sees the shift from current practices to the use of BIM as a significant one, comparable to the move from hand-drafted designs to CAD.

“We don’t know how we will be working with BIM in five years, no one knows, but we do know that we have to start now,” he concluded.

For more information on companies in this article

Related Content

  • IRF Executives Talks: shaping the future of Intelligent transportation
    August 29, 2024
    Technological advances for the intelligent transportation sector are developing at incredible speed globally. For many leaders in the sector, one of the biggest challenges is how they should use new technology to shape the future of intelligent transportation. SWARCO chief executive, Michael Schuch, put forward his ideas in conversation with IRF Director General Susanna Zammataro ahead of the IRF World Congress in Istanbul in October.
  • Empa tests string as bitumen replacement
    May 21, 2021
    The Swiss Federal Laboratories for Materials Testing and Research Centre (Empa) has been testing alternate layers of aggregate and string laid out by a robotic arm (photo courtesy Empa)
  • A virtual virtuous circle
    March 19, 2021
    Virtual sensors will allow a safer driving experience and reduce road maintenance costs. Tactile Mobility’s Eitan Grosbard talks to David Arminas
  • Road safety contract awarded in UK
    November 7, 2019
    An important road safety contract has been awarded in the UK. The Road Safety Foundation won the work to review how investments are prioritised to improve safety outcomes by Highways England (HE). This deal was awarded by the Office of Rail and Road (ORR). Under the terms of the contract the Foundation is to review how HE ranks the location and type of scheme to deliver. This will focus on how these decisions are influenced by HE’s key performance indicators. It will also analyse how HE takes account of