Skip to main content

BIM pilot project for Peri in Germany

Peri is showcasing one of its latest contract wins on its stand at bauma 2016 as part of a focus on projects which aims to demonstrate the company’s wider capabilities. The formwork specialist recently won a contract with joint venture contractor Max Bögl / Porr on the Filstal railway bridge, a pilot project for the use of building information modelling (BIM). The Filstal bridge, which is on the new high-speed line between Stuttgart and Ulm, is one of four projects chosen by Germany’s Federal Ministry of Tr
April 12, 2016 Read time: 2 mins
The Filstal railway bridge is one of four BIM pilot infrastructure projects in Germany

298 Peri is showcasing one of its latest contract wins on its stand at bauma 2016 as part of a focus on projects which aims to demonstrate the company’s wider capabilities. The formwork specialist recently won a contract with joint venture contractor Max Bögl / Porr on the Filstal railway bridge, a pilot project for the use of building information modelling (BIM).

The Filstal bridge, which is on the new high-speed line between Stuttgart and Ulm, is one of four projects chosen by Germany’s Federal Ministry of Transport and Digital Infrastructure (BMVI) to investigate the benefits of BIM. The foundations for the bridge are in place, with Peri currently working on the designs for the pier formwork.

Used to some extent in markets including the UK and US, BIM is a fast-developing technology that Peri expects to spread to other global markets. “BIM is a big topic for us: in the future companies will use BIM technology more and more,” said Peri marketing specialist Martina Pankoke.
Peri’s head of engineering tools & innovation, Jochen Köhler, hopes that BIM will help improve safety as well as bringing time efficiencies through clash detection, which is a more generally understood benefit of BIM. “We want to provide a check list for the climbing formwork so that the person responsible knows exactly what needs to be checked before anyone goes on that scaffold,” said Köhler.

The BIM safety feature would see information such as a check list, assembly information and a sign-off form attached to the BIM model. Other related developments could include the use of QR codes on bespoke elements that would inform the formwork contractor where the element should go, and how it would be installed.

Köhler sees the shift from current practices to the use of BIM as a significant one, comparable to the move from hand-drafted designs to CAD.

“We don’t know how we will be working with BIM in five years, no one knows, but we do know that we have to start now,” he concluded.

For more information on companies in this article

Related Content

  • Turkish customs: TAREKS taken to task
    February 29, 2024
    Turkish customs officials, under the TAREKS inspection regime, are taking a harder look at non-EU-made construction equipment. But it appears that some European manufacturers are being caught up in the importation log jam, reports David Arminas.
  • Tekla models its BIM software
    January 30, 2015
    More and more design and construction of infrastructure, from buildings and power plants to highways are using building information modelling software. BIM is increasingly the must-have ability for a supply chain and Tekla Structures Construction Modeling software allows concrete contractors to be part of the 3D BIM model.
  • Tekla models its BIM software
    January 6, 2017
    More and more design and construction of infrastructure, from buildings and power plants to highways are using building information modelling software. BIM is increasingly the must-have ability for a supply chain and Tekla Structures Construction Modeling software allows concrete contractors to be part of the 3D BIM model.
  • Construction sector's quiet revolution for digital worksites
    February 8, 2017
    The digital worksite topped the agenda at this year’s CECE congress. David Arminas reports from the Czech capital Prague* Europe’s equipment manufacturers and their clients are truly in an age of transformation driven by an increasing move towards the digital worksite. Because this transformation is so deep, there looms big challenges for the entire sector and its supply chain, noted Bernd Holz, president of the CECE – Committee for European Construction Equipment, Europe’s umbrella organisation for