Skip to main content

BIM pilot project for Peri in Germany

Peri is showcasing one of its latest contract wins on its stand at bauma 2016 as part of a focus on projects which aims to demonstrate the company’s wider capabilities. The formwork specialist recently won a contract with joint venture contractor Max Bögl / Porr on the Filstal railway bridge, a pilot project for the use of building information modelling (BIM). The Filstal bridge, which is on the new high-speed line between Stuttgart and Ulm, is one of four projects chosen by Germany’s Federal Ministry of Tr
April 12, 2016 Read time: 2 mins
The Filstal railway bridge is one of four BIM pilot infrastructure projects in Germany

298 Peri is showcasing one of its latest contract wins on its stand at bauma 2016 as part of a focus on projects which aims to demonstrate the company’s wider capabilities. The formwork specialist recently won a contract with joint venture contractor Max Bögl / Porr on the Filstal railway bridge, a pilot project for the use of building information modelling (BIM).

The Filstal bridge, which is on the new high-speed line between Stuttgart and Ulm, is one of four projects chosen by Germany’s Federal Ministry of Transport and Digital Infrastructure (BMVI) to investigate the benefits of BIM. The foundations for the bridge are in place, with Peri currently working on the designs for the pier formwork.

Used to some extent in markets including the UK and US, BIM is a fast-developing technology that Peri expects to spread to other global markets. “BIM is a big topic for us: in the future companies will use BIM technology more and more,” said Peri marketing specialist Martina Pankoke.
Peri’s head of engineering tools & innovation, Jochen Köhler, hopes that BIM will help improve safety as well as bringing time efficiencies through clash detection, which is a more generally understood benefit of BIM. “We want to provide a check list for the climbing formwork so that the person responsible knows exactly what needs to be checked before anyone goes on that scaffold,” said Köhler.

The BIM safety feature would see information such as a check list, assembly information and a sign-off form attached to the BIM model. Other related developments could include the use of QR codes on bespoke elements that would inform the formwork contractor where the element should go, and how it would be installed.

Köhler sees the shift from current practices to the use of BIM as a significant one, comparable to the move from hand-drafted designs to CAD.

“We don’t know how we will be working with BIM in five years, no one knows, but we do know that we have to start now,” he concluded.

For more information on companies in this article

Related Content

  • Dutch road widening benefits from 3D software
    February 24, 2012
    Modern software is stretching traditional design boundaries on a motorway widening in the Netherlands, reports Adrian Greeman There was a time when civil engineering and aesthetics did not mix too well, especially on roads. The artistic ideas of an architect did not blend with the stringent requirements of structure. But modern three-dimensional modelling software is helping this change. Design notions that might have been overly complicated in the past are now attainable with hi-tech analysis tools.
  • Colombia’s ANI agency is driving forward the 4G PPP programme
    April 4, 2016
    Andrade Moreno is a man on a mission. The head of Colombia's infrastructure agency ANI explains how the organisation is giving foreign companies increasing confidence to invest time and money in the country. David Arminas reports Change, especially when it touches the highest levels of South American business and politics, can bring with it personal danger. Luis Fernando Andrade Moreno, president of Colombia's National Infrastructure Agency - ANI - was aware of this when he took on the role in 2011. B
  • Caterpillar: this is what the future looks like
    April 14, 2016
    Fuel efficiency and powertrain alternatives are crucial for the future of construction, while the issue of emissions will remain a priority for some time to come – that was the message from Caterpillar’s roundtable event at bauma 2016. Senior executives from the company spoke with journalists, discussing key future technology developments and trends for the firm. Paolo Fellin is VP Global Construction & Infrastructure, while Ken Hoefling is VP for Building Construction Products. Karl Weiss is VP Earthmovin
  • Italy’s renaissance bridge
    July 21, 2020
    Italian consulting company Italferr created a digital twin for designing the new Genoa bridge and won accolades at Bentley Systems: Bentley Year in Infrastructure Awards