Skip to main content

Benninghoven’s mixing tower meets new emissions targets

Benninghoven showcased the very latest in mixing plant technology at BAUMA, with the erection of a 50m-high BA4000 RPP tower at bauma. A new system for heating recycled material means that emissions are lowered, the heat of the exhaust gases is reduced which means the whole system is more efficient, and the bitumen in the recycled material is not damaged by direct contact with a flame. “This has been designed to optimise recycling,” said Benninghoven’s head of marketing Lars Henrich. “It can produce mix
April 20, 2016 Read time: 2 mins

167 Benninghoven showcased the very latest in mixing plant technology at BAUMA, with the erection of a 50m-high BA4000 RPP tower at bauma.  A new system for heating recycled material means that emissions are lowered, the heat of the exhaust gases is reduced which means the whole system is more efficient, and the bitumen in the recycled material is not damaged by direct contact with a flame.

“This has been designed to optimise recycling,” said Benninghoven’s head of marketing Lars Henrich. “It can produce mixes with over 90 per cent recycled material.”

The secret to handling such a high proportion of RAP is the new heating system. The material is heated in counterflow by air from a hot gas generator. “Normally we have the burner directly in the drum. Here we use the burner to create hot gas so that the flame does not come into contact with the material,” explained Henrich.

The plant has the facility to produce hot recycled mixes and cold recycled mixes, with the cold process able to handle up to 40 per cent RAP. The ‘multi variable cold system’ provides flexibility and is useful when smaller quantities are required, said Henrich.

Every plant is bespoke, designed to suit the needs of a particular customer. Once dismantled at the end of the show, the Benninghoven plant will be heading to a road construction company in Germany. “The customer expects high production rates and the plant has to operate for 30 years, so they need the latest technology,” said Henrich.

Benninghoven expects Germany and other central European countries to be the biggest market for these 4000kg plants. New legislation in Germany relating to air quality and emissions, to be introduced in 2017, will be a driving force behind sales. To date, Benninghoven has delivered three plants, and expects demand to ramp up this year.

All videos

For more information on companies in this article

Related Content

  • Increased use of recycled asphalt pavement
    February 29, 2012
    Increasing material costs mean that the US highway sector is looking to increase the use of recycled asphalt pavement (RAP). At the recent World of Asphalt conference and exhibition in Orlando, Florida, two presentations explained the latest developments.
  • Lintec’s CSM 2500 plant offers low transport costs and quick assembly and disassembly
    February 12, 2013
    Lintec’s new CSM 2500 asphalt mixing plant with parallel drum and conventional screening machine will be on show at bauma. The parallel drum on the plant can be used for hot and cold recycling. Capable of producing 160tonnes/hour, the fully containerised configuration of the CSM 2500 is said by its German manufacturer to ensure lower transport costs and quick and efficient assembly and disassembly. The plant has six screening decks, a 60tonne capacity hot stone bin, a 45tonne reclaimed filler silo, produces
  • Innovative asphalt paver advances for 2015
    April 8, 2015
    Pressure on asphalt paver manufacturers to develop new and more efficient machines is bringing results - Mike Woof writes. For all the key manufacturers in the asphalt paving segment, pressure is being brought to bear with regard to the development of new and more efficient machines. Both for US and European style of pavers, incremental improvements are being seen in machines. In keeping with regulations for Europe and North America, many of the new generation machines are now being powered by the latest lo
  • Volvo CE president unveils emissions technology and product development programme
    January 6, 2017
    Volvo Construction Equipment president Pat Olney has unveiled the low-emissions technology used in the company’s forthcoming Stage IV/Tier 4 Final-compliant machines. He also detailed the progress of investments in Europe and other international markets and announced the extensive development pipeline that will see a radically updated product range launched over the next two years.