Skip to main content

Benninghoven’s mixing tower meets new emissions targets

Benninghoven showcased the very latest in mixing plant technology at BAUMA, with the erection of a 50m-high BA4000 RPP tower at bauma. A new system for heating recycled material means that emissions are lowered, the heat of the exhaust gases is reduced which means the whole system is more efficient, and the bitumen in the recycled material is not damaged by direct contact with a flame. “This has been designed to optimise recycling,” said Benninghoven’s head of marketing Lars Henrich. “It can produce mix
April 20, 2016 Read time: 2 mins

167 Benninghoven showcased the very latest in mixing plant technology at BAUMA, with the erection of a 50m-high BA4000 RPP tower at bauma.  A new system for heating recycled material means that emissions are lowered, the heat of the exhaust gases is reduced which means the whole system is more efficient, and the bitumen in the recycled material is not damaged by direct contact with a flame.

“This has been designed to optimise recycling,” said Benninghoven’s head of marketing Lars Henrich. “It can produce mixes with over 90 per cent recycled material.”

The secret to handling such a high proportion of RAP is the new heating system. The material is heated in counterflow by air from a hot gas generator. “Normally we have the burner directly in the drum. Here we use the burner to create hot gas so that the flame does not come into contact with the material,” explained Henrich.

The plant has the facility to produce hot recycled mixes and cold recycled mixes, with the cold process able to handle up to 40 per cent RAP. The ‘multi variable cold system’ provides flexibility and is useful when smaller quantities are required, said Henrich.

Every plant is bespoke, designed to suit the needs of a particular customer. Once dismantled at the end of the show, the Benninghoven plant will be heading to a road construction company in Germany. “The customer expects high production rates and the plant has to operate for 30 years, so they need the latest technology,” said Henrich.

Benninghoven expects Germany and other central European countries to be the biggest market for these 4000kg plants. New legislation in Germany relating to air quality and emissions, to be introduced in 2017, will be a driving force behind sales. To date, Benninghoven has delivered three plants, and expects demand to ramp up this year.

All videos

For more information on companies in this article

Related Content

  • Global pressures driving bitumen developments
    June 19, 2015
    A raft of global pressures is driving developments in the materials and equipment we use for the handling, storage and treatment of bitumen. The goal is to achieve better performance and longer life for less financial outlay, and at the same time overcome the challenges of inconsistent and varying bitumen supplies. Kristina Smith reports.
  • Multiple mixes for Polish plant
    October 13, 2021
    An Ammann asphalt plant is being used in Poland to deliver multiple mix specifications for a range of clients
  • Roadtec changes the game of asphalt paving
    December 20, 2016
    Truly innovative is Roadtec’s Shuttle Buggy material transfer vehicle. John Irvine, President of Roadtec, explains how and why the ‘Buggy’ changed the game of asphalt paving Road paving technology changed dramatically in the 1930s when the American inventor Harry Barber unveiled the very first asphalt paver. Barber was what we today would call a “game-changer”. Innovations like Barber’s don’t come around often. In fact, decades can pass until another breakthrough product pushes the productivity and q
  • Asphalt plant assists at airport project
    December 19, 2017
    An asphalt plant from ADM has helped in the reconstruction of the runway at South Caicos Airport. Herzog Caribbean recently took delivery of its new asphalt plant to supply material for the runway overhaul on South Caicos Island. The plant, an ADM EX120, delivered 23,000tonnes of material for the project without any downtime, allowing for an April 2017 completion. A division of Missouri-based Herzog Contracting, Herzog Caribbean operates out of Providenciales, the capital city of Turks & Caicos, British We