Skip to main content

Benninghoven unveils an alternating chute for Eco asphalt plant

Benninghoven has launched a cost-efficient alternating chute unit on its ECO asphalt mixing plant. The type ECO asphalt mixing plant range offers outputs from 100tonnes/hour to 320tonnes/hour to ensure maximum mobility and flexibility. The machines can be operated as stationary plant but the can also handle fast location changes without problems, according to Benninghoven. Benninghoven has always relied on loading skip technology as the link between mixer and loading silo. When working like this, the
April 23, 2018 Read time: 2 mins
Benninghoven’s ECO asphalt mixing plant gets an alternating chute unit

167 Benninghoven has launched a cost-efficient alternating chute unit on its ECO asphalt mixing plant.

The type ECO asphalt mixing plant range offers outputs from 100tonnes/hour to 320tonnes/hour to ensure maximum mobility and flexibility.

The machines can be operated as stationary plant but the can also handle fast location changes without problems, according to Benninghoven.

Benninghoven has always relied on loading skip technology as the link between mixer and loading silo. When working like this, the skip volume corresponds to the volume of the mixer.

In essence, the mixer drains the asphalt vertically downwards into the skip. The skip then positions itself vertically above the targeted loading silo pocket and again drains the stored mix vertically downwards … this is a proven technology for excluding segregations in the mix.

The new alternating chute unit is, because it is a purely mechanical structure, less likely to malfunction. There are no sensor systems, motors and brakes and there is also a fast and load-free positioning for silo selection.

Also, separation in the end-product is minimised through active cross-mixing in the material transfer. The geometry of the mixed materials storage silos ensures mass flow instead of core flow, which also prevents segregation in the mix.

There is also a large service opening on the mixer cabinet. It is 600mm high and 1,200mm wide.

For more information on companies in this article

Related Content

  • ADM’s EX Series asphalt plants on show at CONEXPO-CON/AGG 2014
    January 20, 2014
    Claimed by Asphalt Drum Mixers (ADM) to offer high efficiency and a compact design for contractors with low to medium production needs, the U.S. firm will be showcasing its new EX Series asphalt plants with single-drum counterflow technology at CONEXPO-CON/AGG 2014. The EX Series asphalt plants are said to produce between just over 90 to 385.5tonnes/hour at a very low cost per tonne.
  • Benninghoven introduces silenced mastic plant
    March 4, 2016
    Benninghoven has developed the GKL Silent unit for mastic asphalt duties. The unit has no hydraulic drives and is instead all-electric. The firm says that this new low noise system allows work to continue outside of regular working hours and during the night. The unit also benefits from the firm’s sophisticated new control cabinet. Robust and fully computer-controlled, the GKL Silent can be operated from a touchscreen. All data is shown in plain text, are saved and can be read out live from the Webfleet Por
  • Benninghoven introduces silenced mastic plant
    January 6, 2017
    Benninghoven has developed the GKL Silent unit for mastic asphalt duties. The unit has no hydraulic drives and is instead all-electric. The firm says that this new low noise system allows work to continue outside of regular working hours and during the night. The unit also benefits from the firm’s sophisticated new control cabinet. Robust and fully computer-controlled, the GKL Silent can be operated from a touchscreen. All data is shown in plain text, are saved and can be read out live from the Webfleet Por
  • Reducing asphalt plant downtime
    December 12, 2018
    How asphalt plant control add-ons make operation easier while reducing costly downtime - *Carlos Cardenas The word downtime might as well be a curse word in the asphalt production industry. As any operator will say, unplanned plant shutdowns can end up costing a producer heavily in lost production, not to mention a line of unhappy truck drivers and asphalt customers. The key is to get ahead of the problem and spot issues before they skyrocket in severity. Fortunately, some asphalt plant manufacturers offe