Skip to main content

Benninghoven develops novel mobile plant

Benninghoven’s new MBA 2000 mobile asphalt mixing plant is said to lead the market. The unit has five deck screening as standard, compared with conventional units that offer four deck screens. According to Henrich the plant offers a maximum output of up to 160tonnes/hour. Depending on the application, the MBA 2000 can also handle up to 25% of RAP also. Fast set up and commissioning times are claimed for the unit, as well as high mobility. Features include effective thermal insulation of the components in
March 10, 2016 Read time: 2 mins
Benninghoven’s new MBA 2000 offers mobility and versatility
167 Benninghoven’s new MBA 2000 mobile asphalt mixing plant is said to lead the market. The unit has five deck screening as standard, compared with conventional units that offer four deck screens. According to Henrich the plant offers a maximum output of up to 160tonnes/hour. Depending on the application, the MBA 2000 can also handle up to 25% of RAP also. Fast set up and commissioning times are claimed for the unit, as well as high mobility.

Features include effective thermal insulation of the components in the heated section is exemplary, further boosting efficiency. The wearing plates are said to be designed for a long service life even when using hard stone materials. The machine features a sophisticated control system, the BLS 3000, which is said to offer simple operation. All functions are displayed in the computer animation and controlled with a mouse or keyboard. In addition to fully automatic mode, the control system also offers the option of a manual operating level. This allows the mixing operator to control all actuators and valves separately. The real time representation of the mixing process with graphical and alphanumerical monitoring of set values and actual values is displayed on the monitor.
All videos

For more information on companies in this article

Related Content

  • UK contractor operating sophisticated Benninghoven asphalt plant
    April 27, 2015
    A sophisticated Benninghoven asphalt plant is now in use by a UK contractor close to London - Mike Woof writes UK contractor FM Conway is now operating a second highly advanced asphalt plant in the London area. As with the first unit supplied a few years ago, the plant was designed and constructed to FM Conway’s specific needs by leading producer Benninghoven. This latest plant is located to the west of London (the earlier plant is to the east of the city) and close to Heathrow Airport. Being situated
  • Ciber’s iNOVA 2000 plant for Latin America market
    August 25, 2016
    Now part of the Wirtgen Group, Brazilian firm CIBER produces asphalt plants for the Latin American market and has developed a series of technological innovations for this sector. The firm is now introducing its new iNOVA 2000 plant design that it will offer for Latin America. The firm has developed the machine based on its experience of the sector, while also incorporating the latest advances in asphalt plant technology. The plant has benefited from the firm’s research into the needs of different asph
  • Increasing asphalt plant sophistication
    June 23, 2015
    Increasing asphalt plant sophistication will boost the capabilities for the use of recycled materials - Mike Woof writes Major innovation is being seen in the asphalt plant sector with many of the major manufacturers developing sophisticated new plants. The increased use of recycled materials and reduced fumes emissions are all important issues for the segment. In the US for example, the potential for recycled asphalt has been well identified. It is now one of the most frequently recycled industrial materia
  • Multiple asphalt plants supply major highway construction
    July 12, 2012
    One company has produced eight asphalt plants for a major project, and others are introducing new models as Patrick Smith reports Algeria's US$11.2 billion East-West Highway development, the world's largest current highway construction project, forms part of the larger Trans-Maghreb Motorway project, and is scheduled for completion in 2010. It will run for 1,216km, ensuring the link between Annaba in the north-east and Tlemcen in the north-west, passing directly through 24 provinces and linking Algeria to T