Skip to main content

On the beach

Two drivers in the UK have found to their cost that driving on a beach is not the cleverest thing to do. One driver of a Land Rover put his faith in his GPS and unquestioningly followed its directions, using a stretch of sand as a short cut. However his journey turned out to be somewhat delayed when the car became stuck in the sand and the tide came in, leaving the Land Rover awash.
December 24, 2015 Read time: 1 min

Two drivers in the UK have found to their cost that driving on a beach is not the cleverest thing to do. One driver of a Land Rover put his faith in his GPS and unquestioningly followed its directions, using a stretch of sand as a short cut. However his journey turned out to be somewhat delayed when the car became stuck in the sand and the tide came in, leaving the Land Rover awash. An affluent young driver meanwhile found out that his upmarket 6197 Bentley was rather too heavy for the sand, when it also became stuck. Both vehicles were later towed out though the Bentley proved particularly reluctant to leave the beach, with a towing point breaking off during the process.

For more information on companies in this article

Related Content

  • Terex trucks make epic tough trek
    June 21, 2016
    A fleet of 29 Terex Trucks recently made a journey of 20,800km by road, river and sea The machines were delivered to the site in Myanmar, to work in a particularly tough extraction operation. The fleet was delivered to a site in Kachin State in northern Myanmar, having been ordered by three local firms to carry blasted material haul distances of around 2km for processing. The three companies; Aung Hein Min Gems, Yar Za Htar Ne Gems and Myanmar Thura Gems contacted Yangon-based dealer Aung Hein Min
  • Tram time
    November 20, 2014
    A driver of a compact Nissan car gave passengers waiting for a tram in the UK town of Oldham something of a surprise. Instead of the tram they expected to see, the small Nissan car drew to a halt in front of the stop.
  • Sandvik’s DT1131i jumbo and iSURE software in Iceland and Norway
    August 14, 2019
    Sandvik’s DT1131i three-boom, electro-hydraulic jumbo, iSURE tunnel management software and the latest drill bit hardware were recently put to the test in Iceland and Norway* Czech contractor Metrostav recently achieved 105m of tunnel excavation in a record-breaking six days. But it will be consistent performance and progress that will see Iceland’s Dyrafjordurgong Tunnel in the remote Westfjords region open on time and on budget. The 5.3km Dyrafjordurgong Tunnel is costing around €69 million and due
  • Geosynthetics stabilise differential settlement
    May 3, 2012
    The ongoing Highways Agency A66 Carkin Moor to Scotch Corner project involves upgrading the original single carriageway to address safety concerns, particularly at junctions and crossings. Where differential settlement is threatening a remodelled junction, Tensar International's new TriAx geogrid provides an additional dimension of stability, saving design and build contractors Balfour Beatty Regional Civil Engineering Limited (BBRCEL) the heavy time and costs inherent in conventional remedial solutions and