Skip to main content

Bauer and Europe’s deepest underground parking garage

BAUER Funderingstechniek has constructed an underwater concrete base for Europe's deepest parking garage in Leiden, a university city in the Dutch province of South Holland. Leiden is known for being the birthplace of Rembrandt. The Lammermarkt is an area with a park in the city centre and is used for festivals and events. In addition, the picturesque "Molen de Valk", also known as "The Falcon" is located here. It is a stone windmill that was built in 1785 and is now one of the distinctive sights of the
July 7, 2016 Read time: 2 mins
Bauer digs deep in Leiden
8350 BAUER Funderingstechniek has constructed an underwater concrete base for Europe's deepest parking garage in Leiden, a university city in the Dutch province of South Holland.

Leiden is known for being the birthplace of Rembrandt. The Lammermarkt is an area with a park in the city centre and is used for festivals and events. In addition, the picturesque "Molen de Valk", also known as "The Falcon" is located here. It is a stone windmill that was built in 1785 and is now one of the distinctive sights of the city.

An underground parking garage is being built under the Lammermarkt. With a depth of 22m, it will be the deepest underground parking garage in the entire EU.

BAUER Funderingstechniek, the Dutch subsidiary of BAUER Spezialtiefbau and based in Mijdrecht, constructed an underwater concrete base with 585 GEWI piles. Work was done on behalf of Belgian infrastructure group 1303 BESIX and the Dutch infrastructure group Dura Vermeer.

Drilling has been carried out to a depth of 55m. Three small-diameter drilling rigs on pontoons from 8454 KLEMM Bohrtechnik were used for this. KLEMM Bohrtechnik specialises in the development of high-quality and high-performance drilling equipment with a total weight up to 32tonnes.

In addition, Bauer pumped away and de-sanded the drilling fluid under water. Work was completed last November. The underground parking garage with its 525 parking spaces will be completely finished by 2017.

The BAUER Group, with 110 subsidiaries, provides services, equipment and products dealing with ground and groundwater. It was founded in 1790 and is based in Germany’s Schrobenhausen region, Bavaria. In 2015, it employed about 10,700 people in around 70 countries and achieved total group revenues of €1.66 billion.

For more information on companies in this article

Related Content

  • The A14 Cambridge to Huntingdon improvement scheme takes shape
    May 31, 2017
    Highways England’s project manager gives sneak peek into progress on the UK’s biggest road upgrade now under construction. Road construction workers often find interesting buried items when building roads and the UK’s A14 Cambridge to Huntingdon improvement scheme is proving the point. It’s been less than half a year since construction started on the €1.76 billion A14 scheme, Highways England’s largest ongoing project. Highways England is the wholly government-owned company responsible for modernising, main
  • Curved girders for the Gaasperdammerweg A9 section in Amsterdam
    May 22, 2018
    Dutch authorities recently needed to add traffic lanes to two flyovers at the Holendrecht junction on the Gaasperdammerweg section of the A9 motorway in Amsterdam It was in November 2014 that the Directorate-General for Public Works and Water Management of the Netherlands Rijkswaterstaat awarded the A9 Gaasperdammerweg public-private-partnership project to IXAS Zuid-Oost, a consortium consisting of Ballast Nedam, Fluor, Heijmans and 3i Infrastructure. The A9 Gaasperdammerweg project is the third section
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • New Penang Bridge takes shape
    April 10, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b