Skip to main content

Bauer and Europe’s deepest underground parking garage

BAUER Funderingstechniek has constructed an underwater concrete base for Europe's deepest parking garage in Leiden, a university city in the Dutch province of South Holland. Leiden is known for being the birthplace of Rembrandt. The Lammermarkt is an area with a park in the city centre and is used for festivals and events. In addition, the picturesque "Molen de Valk", also known as "The Falcon" is located here. It is a stone windmill that was built in 1785 and is now one of the distinctive sights of the
July 7, 2016 Read time: 2 mins
Bauer digs deep in Leiden
8350 BAUER Funderingstechniek has constructed an underwater concrete base for Europe's deepest parking garage in Leiden, a university city in the Dutch province of South Holland.

Leiden is known for being the birthplace of Rembrandt. The Lammermarkt is an area with a park in the city centre and is used for festivals and events. In addition, the picturesque "Molen de Valk", also known as "The Falcon" is located here. It is a stone windmill that was built in 1785 and is now one of the distinctive sights of the city.

An underground parking garage is being built under the Lammermarkt. With a depth of 22m, it will be the deepest underground parking garage in the entire EU.

BAUER Funderingstechniek, the Dutch subsidiary of BAUER Spezialtiefbau and based in Mijdrecht, constructed an underwater concrete base with 585 GEWI piles. Work was done on behalf of Belgian infrastructure group 1303 BESIX and the Dutch infrastructure group Dura Vermeer.

Drilling has been carried out to a depth of 55m. Three small-diameter drilling rigs on pontoons from 8454 KLEMM Bohrtechnik were used for this. KLEMM Bohrtechnik specialises in the development of high-quality and high-performance drilling equipment with a total weight up to 32tonnes.

In addition, Bauer pumped away and de-sanded the drilling fluid under water. Work was completed last November. The underground parking garage with its 525 parking spaces will be completely finished by 2017.

The BAUER Group, with 110 subsidiaries, provides services, equipment and products dealing with ground and groundwater. It was founded in 1790 and is based in Germany’s Schrobenhausen region, Bavaria. In 2015, it employed about 10,700 people in around 70 countries and achieved total group revenues of €1.66 billion.

For more information on companies in this article

Related Content

  • New bridges, ramp and tunnel for Dubai
    February 19, 2020
    New flyover bridges, a ramp and a tunnel connection are being built in Dubai.
  • Holding back
    February 6, 2012
    AN INNOVATIVE slurry wall solution has been used by Bachy Soletanche at the Alderley Edge By-Pass project in the UK. Bachy Soletanche provided assistance for the A34 Alderley Edge by-pass project in the UK being carried out by main contractor Birse Civils. This solution was required to tackle challenges posed by the water table at the Welsh Row section. Bachy Soletanche used its experience with slurry cut-off walls, a technique rarely used in Britain on road construction, to benefit a tricky section of the
  • Variable message signs aid parking, traffic control
    February 14, 2012
    From the highway to the parking space: message sign technology has proved that it simplifies wayfinding Variable message signs (VMS) are often located at key decision points on busy highways to help manage the network by providing advanced warning to drivers of emergencies and incidents. They are also used to warn drivers of events that may cause delays in the future such as road works and major events. An example comes from the USA where, to stimulate economies and refresh downtown areas, cities are build
  • New TKH technology can vary parking charges based on vehicle size
    March 14, 2013
    Dutch technology company TKH has developed a new technology enabling parking garage owners to charge more for vehicles which do not fit in one parking space. Cameras at the entrance recognise car registration plates and vehicle size. Parking garage owners can then choose to charge a higher rate, or direct individual vehicles to certain parking bays. Cars which fail to follow instructions, or use two parking bays, can then be charged accordingly at the exit.