Skip to main content

Bauer and Europe’s deepest underground parking garage

BAUER Funderingstechniek has constructed an underwater concrete base for Europe's deepest parking garage in Leiden, a university city in the Dutch province of South Holland. Leiden is known for being the birthplace of Rembrandt. The Lammermarkt is an area with a park in the city centre and is used for festivals and events. In addition, the picturesque "Molen de Valk", also known as "The Falcon" is located here. It is a stone windmill that was built in 1785 and is now one of the distinctive sights of the
July 7, 2016 Read time: 2 mins
Bauer digs deep in Leiden
8350 BAUER Funderingstechniek has constructed an underwater concrete base for Europe's deepest parking garage in Leiden, a university city in the Dutch province of South Holland.

Leiden is known for being the birthplace of Rembrandt. The Lammermarkt is an area with a park in the city centre and is used for festivals and events. In addition, the picturesque "Molen de Valk", also known as "The Falcon" is located here. It is a stone windmill that was built in 1785 and is now one of the distinctive sights of the city.

An underground parking garage is being built under the Lammermarkt. With a depth of 22m, it will be the deepest underground parking garage in the entire EU.

BAUER Funderingstechniek, the Dutch subsidiary of BAUER Spezialtiefbau and based in Mijdrecht, constructed an underwater concrete base with 585 GEWI piles. Work was done on behalf of Belgian infrastructure group 1303 BESIX and the Dutch infrastructure group Dura Vermeer.

Drilling has been carried out to a depth of 55m. Three small-diameter drilling rigs on pontoons from 8454 KLEMM Bohrtechnik were used for this. KLEMM Bohrtechnik specialises in the development of high-quality and high-performance drilling equipment with a total weight up to 32tonnes.

In addition, Bauer pumped away and de-sanded the drilling fluid under water. Work was completed last November. The underground parking garage with its 525 parking spaces will be completely finished by 2017.

The BAUER Group, with 110 subsidiaries, provides services, equipment and products dealing with ground and groundwater. It was founded in 1790 and is based in Germany’s Schrobenhausen region, Bavaria. In 2015, it employed about 10,700 people in around 70 countries and achieved total group revenues of €1.66 billion.

For more information on companies in this article

Related Content

  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • Liebherr unveils THS 110 D-K crawler concrete pump
    April 10, 2018
    Introducing its new THS 110 D-K crawler concrete pump, Liebherr says the model offers a maximum delivery rate of 102m³/hour and features a six-cylinder engine. The concrete pump, which is fitted onto a crawler running gear, is moved and controlled via a radio remote control. The three models in the series of Liebherr crawler concrete pumps are the THS 80 D-K, the THS 110 D-K and the THS 140 D-K, with maximum delivery rates ranging from 65m³/hour to 135m³/hour. Liebherr says the during the design phase it
  • Normet to invest over €7 million
    March 7, 2012
    Underground construction in the world is increasing, metal ores are mined deeper, and there is an ever-growing demand in emerging countries for metals, infrastructure and energy.