Skip to main content

Bauer and Europe’s deepest underground parking garage

BAUER Funderingstechniek has constructed an underwater concrete base for Europe's deepest parking garage in Leiden, a university city in the Dutch province of South Holland. Leiden is known for being the birthplace of Rembrandt. The Lammermarkt is an area with a park in the city centre and is used for festivals and events. In addition, the picturesque "Molen de Valk", also known as "The Falcon" is located here. It is a stone windmill that was built in 1785 and is now one of the distinctive sights of the
July 7, 2016 Read time: 2 mins
Bauer digs deep in Leiden
8350 BAUER Funderingstechniek has constructed an underwater concrete base for Europe's deepest parking garage in Leiden, a university city in the Dutch province of South Holland.

Leiden is known for being the birthplace of Rembrandt. The Lammermarkt is an area with a park in the city centre and is used for festivals and events. In addition, the picturesque "Molen de Valk", also known as "The Falcon" is located here. It is a stone windmill that was built in 1785 and is now one of the distinctive sights of the city.

An underground parking garage is being built under the Lammermarkt. With a depth of 22m, it will be the deepest underground parking garage in the entire EU.

BAUER Funderingstechniek, the Dutch subsidiary of BAUER Spezialtiefbau and based in Mijdrecht, constructed an underwater concrete base with 585 GEWI piles. Work was done on behalf of Belgian infrastructure group 1303 BESIX and the Dutch infrastructure group Dura Vermeer.

Drilling has been carried out to a depth of 55m. Three small-diameter drilling rigs on pontoons from 8454 KLEMM Bohrtechnik were used for this. KLEMM Bohrtechnik specialises in the development of high-quality and high-performance drilling equipment with a total weight up to 32tonnes.

In addition, Bauer pumped away and de-sanded the drilling fluid under water. Work was completed last November. The underground parking garage with its 525 parking spaces will be completely finished by 2017.

The BAUER Group, with 110 subsidiaries, provides services, equipment and products dealing with ground and groundwater. It was founded in 1790 and is based in Germany’s Schrobenhausen region, Bavaria. In 2015, it employed about 10,700 people in around 70 countries and achieved total group revenues of €1.66 billion.

For more information on companies in this article

Related Content

  • Dutch SolaRoad powers ahead
    May 10, 2016
    In late 2014, SolaRoad, reportedly the first solar roadway, was opened in Amsterdam, along 70m of a cycle path between two suburbs of the Dutch capital. SolaRoad consists of a cycle path constructed of concrete modules measuring 2.5m x 3.5m. In one lane, solar cells are fitted underneath a tempered glass top layer of around 1cm thickness, covered by a rough, transparent coating. The solar electricity from the road is fed into the electricity grid.
  • Astec Industries emphasises innovation at Conexpo 2014
    January 6, 2017
    Astec Industries, which is showcasing 45 pieces of equipment at this week’s Conexpo 2014, most of it new or upgraded, has outlined its plans for the future with president and CEO Ben Brock stressing that the group is going on a major export drive.
  • Astec Industries emphasises innovation at Conexpo 2014
    March 4, 2014
    Astec Industries, which is showcasing 45 pieces of equipment at this week’s Conexpo 2014, most of it new or upgraded, has outlined its plans for the future with president and CEO Ben Brock stressing that the group is going on a major export drive.
  • A third of Mecklenburg Vorpommern state roads in poor condition
    May 19, 2016
    Only 44% of roads in the northeastern German state of Mecklenburg Vorpommern are in good or very good condition, according to a transport infrastructure report presented to the German parliament. Also, a third are in poor or very poor condition. The state - the least densely populated in all Germany - performed well compared to other states, according to German media reports. But there are more than 600km where the damage is so bad that it must be repaired as soon as possible or at least be closely m