Skip to main content

Balfour Beatty lifts bridge into place over UK’s M54

In the UK, Balfour Beatty has lifted a new bridge into place over the M54 motorway as part of a €14.56 million (£12 million) project to connect a new high-tech business park to the road network and to provide access for the new Jaguar Land Rover plant. The bridge, which will serve the i54 business park in South Staffordshire, was delivered for Staffordshire County Council, Wolverhampton City Council and South Staffordshire Council, as part of the Midlands Highways Alliance framework.
May 14, 2014 Read time: 2 mins
In the UK, 1146 Balfour Beatty has lifted a new bridge into place over the M54 motorway as part of a €14.56 million (£12 million) project to connect a new high-tech business park to the road network and to provide access for the new 6337 Jaguar Land Rover plant.

The bridge, which will serve the i54 business park in South Staffordshire, was delivered for 4798 Staffordshire County Council, Wolverhampton City Council and South Staffordshire Council, as part of the Midlands Highways Alliance framework.

The bridge lift was carried out during a full road closure overnight on Saturday 11 January. Balfour Beatty raised the bridge to the required height at its site compound adjacent to the motorway and then transported it along the M54 on self-propelled modular transport units so that it could be slotted into position.

The bridge is a composite structure comprising of four 155cm weathered steel beams underneath an in-situ concrete deck, which weighs 411tonnes with a Span length of 40.8m. The bridge deck was constructed on site, using beams supplied by Mabey Bridge. Pre-assembly of the beams and deck at Balfour Beatty’s site compound prior to the lift reduced the amount of time the motorway needed to be closed for installation.

Mark Farrah, Balfour Beatty managing director for the North and Midlands Division, said, “I’m delighted to have delivered this important milestone for the Midlands Highways Alliance. This was a complex operation and the smooth delivery was the result of meticulous planning by Staffordshire County Council and the Balfour Beatty project team on site.”

For more information on companies in this article

Related Content

  • Balfour and Vinci slide bridge over the M42
    January 6, 2023
    Workers slid the concrete shell of a 12,600-tonne bridge a record 165m to position it across the M42 motorway in the northern English county of Warwickshire.
  • Bridge replacement funding approved
    May 10, 2012
    The UK government has confirmed the funding to build a replacement for Northside Road Bridge in Workington, which was destroyed in the floods of November, 2009. Local Transport Minister Norman Baker said that the Department for Transport will provide £11.17 million (e13.25 million) towards the new permanent crossing of the River Derwent in County Cumbria. The council’s Cabinet last month approved Birse Civils, part of the Balfour Beatty Group, as the preferred contractor to build the new bridge.
  • Rising to the challenge
    July 18, 2012
    Visualise today's concept of a major commercial traffic corridor in the western United States. A roadway responsible for delivering goods to Arizona, Nevada and Utah, that also connects Mexico to the United States to Canada through the North American Free Trade Agreement (NAFTA). What springs to mind? A multi-lane highway carrying thousands of vehicles a day past cities at speeds up to 113km/hour, while egress ramps make sure vehicles get safely to city streets and their final destination. This is not the c
  • Steel for Loch Ba bridge
    February 6, 2012
    Allerton Steel, on behalf of R J McLeod, has fabricated the steelwork for a replacement bridge at Loch Ba on Rannoch Moor in the Highlands as part of its A82 upgrade scheme for Transport Scotland. R J McLeod is the civil contractor on the £2.2 million (E2.6 million) scheme which replaces the existing three-span reinforced concrete bridge.