Skip to main content

Back road drama

A man in South Carolina had a lucky escape after being trapped in his car for 33 hours after it crashed off the road in a rural area. After making a wrong turn and ending up on a gravel road, the man lost control of the vehicle despite his slow speed and the car fell 12m from the roadway. He prayed, called for help and beeped the horn repeatedly and was finally rescued after the driver of a forestry vehicle stopped nearby and heard the car horn. Emergency services were called to the scene and they were able
December 2, 2013 Read time: 2 mins
A man in South Carolina had a lucky escape after being trapped in his car for 33 hours after it crashed off the road in a rural area. After making a wrong turn and ending up on a gravel road, the man lost control of the vehicle despite his slow speed and the car fell 12m from the roadway. He prayed, called for help and beeped the horn repeatedly and was finally rescued after the driver of a forestry vehicle stopped nearby and heard the car horn. Emergency services were called to the scene and they were able to use hydraulic equipment to prise open the doors of the vehicle and rescue the man. He was later taken to hospital and although he had a number of injuries they were not life-threatening and he will recover. Police did however ticket him for driving recklessly. He has not had much luck with motor vehicles and this incident is the latest of several mishaps. His own car broke down, as did the first two rental vehicles he drove, with this third car being wrecked when he ran off the road. Perhaps someone is trying to send him a message?

Related Content

  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v
  • Canada: dump truck slams into bridge, partially demolishing it
    February 12, 2015
    In Canada, the driver of a dump truck that slammed into a pedestrian bridge, partially collapsing it on to road below, may have to pay for his mistake. Highway 132 in a suburb of Montreal was closed overnight while a demolition crew hastily tore down the remaining section of walkway over the road. Police are questioning the driver of the snow-removal dump truck who reportedly was travelling down the highway with his dumper raised, hitting the bridge which was built in 1979 and had recently undergone a US$
  • Switzerland’s new tunnel bore being built
    April 19, 2018
    A major new road tunnel project is being constructed in Switzerland – Mike Woof writes Construction work is now underway in Switzerland for the new Belchen Tunnel bore, a project that has resulted from the country’s long-term infrastructure planning. The building of this latest tunnel is important for Switzerland economically as it will deliver an upgraded link for a major transport infrastructure connection. When it is complete, the tunnel will form part of the vital A2 route between Basel, in the north
  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno