Skip to main content

Avoiding route

A truck driver is now regretting having trusted his satellite navigation system after having been stuck three times in a single day in the same village in Wales. The man was attempting to drive his delivery truck from Bangor to Aberystwyth. However he found the village of Beddgelert in Gwynedd a barrier to his journey, with the truck proving unable to negotiate a narrow bridge. Police managed to escort the red-faced driver and his over-sized vehicle to an alternative route.
February 22, 2012 Read time: 1 min
A truck driver is now regretting having trusted his satellite navigation system after having been stuck three times in a single day in the same village in Wales. The man was attempting to drive his delivery truck from Bangor to Aberystwyth. However he found the village of Beddgelert in Gwynedd a barrier to his journey, with the truck proving unable to negotiate a narrow bridge. Police managed to escort the red-faced driver and his over-sized vehicle to an alternative route.

Related Content

  • Stonehenge tunnel plans revised
    February 8, 2018
    Plans for the £1.6 billion Stonehenge Tunnel bypass in the UK have now been revised.
  • Efficient asset management delivers
    April 25, 2013
    Maximising the economic benefit of infrastructure assets can be achieved through delivering better quality maintenance. Increasing utilisation of infrastructure follows on from those assets being in better condition. Clearly by tracking infrastructure condition closely, huge gains can be made in addressing technical issues before they become more serious and more costly, as well as minimising disruption. In UK city Birmingham, high resolution aerial photography from Bluesky is helping the city council under
  • ARTBA annual video competition winners
    March 4, 2021
    ARTBA’s annual video competition winners have been announced.
  • Fast resurfacing work in UK by contractor Eurovia
    May 15, 2017
    In the UK the contractor Eurovia has recently carried out a challenging resurfacing job within a tight timescale. The firm had to contend with live traffic on a busy stretch of motorway, while carrying out the work close to shared intersections. The traffic was particularly heavy also during part of the job due to a holiday period and large numbers of tourist vehicles using the stretch of motorway.