Skip to main content

ATLAS goes electric with the new excavator 350MH-E

Atlas is unveiling its newest excavator, the 350MH-E. It is so new that only the prototype was available at the beginning of this year, but the company is proud of its all-electric version of its best-selling 350MH. Atlas claims the electric version will have around 25% less operating cost than a traditional excavator. But even though it is electric, it uses 95% of the same parts are the non-electric model making just as easy to maintain.
February 2, 2015 Read time: 2 mins
Atlas MH350, an all-electric excavator, with sliding door
7985 Atlas is unveiling its newest excavator, the 350MH-E. It is so new that only the prototype was available at the beginning of this year, but the company is proud of its all-electric version of its best-selling 350MH.

Atlas claims the electric version will have around 25% less operating cost than a traditional excavator. But even though it is electric, it uses 95% of the same parts are the non-electric model making just as easy to maintain.

The 170kW engine gets its power through 80m of cable wrapped around a cable wheel at the rear of the vehicle. Power is through a 24V 40A transformer and total power of the machine is around 70kW.

The operator has a better view to the rear of the machine because of a lower vehicle profile, thanks to the electric engine. The operator also has electric climate control and heating and there is an optional rear-view camera with colour display. Atlas is continually updating its equipment and the new cabs now have LED interior lighting and a removable lower windscreen for better visibility and come with a sliding door.

The 160Wsr short-tail wheeled excavator now has the same equipment as found in the standard wheeled excavator range, including the 05-electronics and automatic air conditioning as standard. It is now also possible to program the oil pressure and flow for up to 10 attachment tools.

All machines with 201 Deutz and 196 Cummins engines are equipped with an engine-stop function.

For more information on companies in this article

Related Content

  • New 21tonne class excavator from Hyundai
    January 17, 2014
    The new mid-size excavator from Hyundai Construction Equipment is the Tier 4 Interim compliant R220LC-9A, being introduced at Conexpo. This 22.5tonne excavator is said to offer improved hydraulics, increased operator comfort and added durability, while it suits duties in mid-sized earthmoving projects.
  • New asphalt paving technologies boost performance
    February 28, 2012
    Sophisticated new paving technologies are coming to market that will help boost quality and performance. New paving technologies are being introduced to meet the differing demands of both North American and European customers. Although North American and European paving techniques do vary, there are also some control technologies being introduced that will help quality for both approaches.
  • Ausa’s new D601 AHG dumper offers lower fuel consumption and emissions levels
    April 24, 2018
    Ausa has launched a new D601AHG dumper featuring the company’s latest Start&Stop system and an automatic Eco mode for lower fuel consumption and exhaust emissions, all powered by a 3.6 litre Deutz TD 3.6 55kw DOC diesel engine. The product also features a digital control screen in the cab, large steps and easy-grab handles. Cameras allow all-round vision, and there are proximity sensors and a skip and rear counterweight to increase the visibility of the operator’s surroundings.
  • New tunnelling machines are coming to market
    May 13, 2015
    Major gains in tunnelling productivity and performance are claimed for a series of new machines now coming to market These new tools will help contractors boost productivity and versatility in an array of applications. The new equipment items are designed for a variety of tasks, including drilling and shotcreting duties. One of the leaders in the underground equipment sector, Atlas Copco, has a new line-up of single and twin boom drill rigs, which suit duties in smaller tunnelling applications. The fi