Skip to main content

Atlas Copco’s WEDA 04S pump

The WEDA 04S is the latest addition to the Atlas Copco Portable Energy line-up of small submersible pumps for the light construction and general equipment rental industries. A 0.4kW on-site sludge/trash pump with a maximum flow of 270lpm and a maximum head of 10.5m, the WEDA 04S complements the WEDA line of under 1kW single-phase drainage, sludge and residual pumps released last year. The new pump model has a cast iron vortex impeller that is able to pump dirty water and handle solids up to 2.5cm in size.
January 30, 2014 Read time: 2 mins
The WEDA 04S is the latest addition to the 161 Atlas Copco Portable Energy line-up of small submersible pumps for the light construction and general equipment rental industries. A 0.4kW on-site sludge/trash pump with a maximum flow of 270lpm and a maximum head of 10.5m, the WEDA 04S complements the WEDA line of under 1kW single-phase drainage, sludge and residual pumps released last year.

The new pump model has a cast iron vortex impeller that is able to pump dirty water and handle solids up to 2.5cm in size. This makes the WEDA 04S a practical choice for dewatering sewage on construction sites or flooded building basements, removing rainwater from sandy or muddy ditches and excavation sites, or getting rid of unwanted water during maintenance of utility manholes.

Described as robust and easy to maintain thanks to its triple seal system (double mechanical shaft seals constructed from silicon carbide with an additional lip seal), the WEDA 04S pump’s thermal protection gives the motor additional reliability and run-dry capabilities. Its low 10kg weight and compact dimensions ensure the pump is easily portable from one dewatering task to the next.

The Atlas Copco WEDA small range pumps also consists of: the WEDA 04 and WEDA 08 drainage pumps; the WEDA 04B residual pump that draws water down to 1mm; and the sand-and mud-resistant WEDA 08S sludge pump. Atlas Copco also offers a range of kits, hoses and coupling accessories for the WEDA pumps.

The CE-compliant 50Hz variant of the WEDA 04S is available now from the Atlas Copco Portable OEM Solutions factory in Bad Oeynhausen, Germany. The CSA-UL approved 60Hz version will be available in early 2014.

For more information on companies in this article

Related Content

  • Upgrading Bolivia’s important Uyuni – Condo K Highway
    May 16, 2016
    Upgrading Bolivia’s Uyuni – Condo K route will help boost the country’s economy - Mauro Nogarin writes. The area of influence along the new Uyuni - Huarancani - Condo K road in Bolivia is of major importance to the country’s economy as it has great agricultural potential for quinoa. The highway is located in south-western Potosi and it has a cultivated area of 55,000ha, with an annual output of 13,154tonnes of quinoa. South-western Potosi is also one of the areas with the highest population of camelid lives
  • Versatile vehicle
    February 15, 2012
    JCB is widening its WORKMAX range of utlity vehciles with the addition of a new 4x4 model. The new model is the WORKMAX 800D and offers 600kg maximum payload and this introduction extends the range, which also includes the 1000D model 4x4, and the 6x4 variant. Power for the new model comes from a 784cc Yanmar diesel engine coupled to a two-speed CVT with a Kevlar belt. The 800D model is a mid-range model with 4x4 drive and a selectable differential lock that is electronically controlled.
  • Innovations for asphalt compaction
    June 15, 2012
    Asphalt compaction advances were unveiled from an array of manufacturers at the INTERMAT 2012 event - Mike Woof reports. With new emissions legislation being introduced, manufacturers are rolling out a range of new asphalt compaction models designed to meet the latest requirements. These include both large rollers for high-production highway operations and compact machines designed for the rental market and suited to urban applications, with the latter segment becoming particularly competitive at present.
  • Underground routes for highways
    July 20, 2012
    Increasingly, and where possible, roads are being built in tunnels often for environmental reasons, writes Patrick Smith As part of the new M7 motorway development in the southwest of Ireland, the four-lane route crosses the River Shannon near Limerick, before it flows into the Atlantic. Centrepiece of the 10km long Limerick Southern Ring Road is the required tunnelling (675m long), which including the north and south entrance and exit ramps, means it will be 915m long. Completion of the work is planned for