Skip to main content

Ammann has developed a high mobility asphalt plant

The new Prime 100 mobile asphalt plant from Ammann is designed for high mobility. This continuous plant can deliver 100tonnes/hour and features all of its main components inside a single standard shipping container. A company spokesperson said, “All you have to do is connect the bitumen tank and an electric power source.” The new Prime 100 unit is the latest addition to the Prime range and is a smaller and even more mobile version of the well proven Prime 140, with its 140tonnes/hour capacity. In addition
January 6, 2017 Read time: 2 mins
The Prime is Amman’s easily moved asphalt plant
The new Prime 100 mobile asphalt plant from 6791 Ammann is designed for high mobility. This continuous plant can deliver 100tonnes/hour and features all of its main components inside a single standard shipping container. A company spokesperson said, “All you have to do is connect the bitumen tank and an electric power source.”

The new Prime 100 unit is the latest addition to the Prime range and is a smaller and even more mobile version of the well proven Prime 140, with its 140tonnes/hour capacity. In addition to its exceptional mobility the Prime 100 is very compact when assembled, while it takes around one working day to commission once it arrives onsite. The firm has designed the plant so that it can be set up quickly with only a minimum of site preparation needed. The spokesperson said, “As long as the base has been compacted, it can operate. The plant has everything it needs.”

Despite being smaller than the existing Prime 140, the new Prime 100 plant still features high-quality Ammann core components for high performance and a quality output.

For more information on companies in this article

Related Content

  • Well-educated personnel are the best investment for the future says the Ammann international training centre
    May 20, 2014
    Far too often, managers will view training as a luxury and not as a competitive and strategic necessity. Lazy team leaders regularly argue that it is a waste of time and money training their people, not least because these same trainees might subsequently leave the organisation. Courses are seen as an interruption, and a good way to delay things. There is always something much more pressing and important on the to-do list and staff can end up feeling forced into the training department. But these are weak a
  • Hydrogen burners for asphalt plants
    September 3, 2024
    Key manufacturers in the asphalt plant market, Ammann, Benninghoven and Marini, are developing systems able to use alternative fuels to reduce CO2 emissions.
  • Efficient aggregate production with new technology
    December 9, 2022
    New equipment is providing major benefits for aggregate production, offering superior product quality as well as increased throughput, while also being able to better meet sustainability targets for customers
  • Improved PMB plant from Massenza
    March 5, 2025

    Italian firm Massenza has carried out an extensive redesign of its PMB plant line-up. The new generation of PMB plants from the firm includes three models, the compact Smart model, the medium sized Klever and the top-of-the-range Super Klever.