Skip to main content

Ammann has developed a high mobility asphalt plant

The new Prime 100 mobile asphalt plant from Ammann is designed for high mobility. This continuous plant can deliver 100tonnes/hour and features all of its main components inside a single standard shipping container. A company spokesperson said, “All you have to do is connect the bitumen tank and an electric power source.” The new Prime 100 unit is the latest addition to the Prime range and is a smaller and even more mobile version of the well proven Prime 140, with its 140tonnes/hour capacity. In addition
January 6, 2017 Read time: 2 mins
The Prime is Amman’s easily moved asphalt plant
The new Prime 100 mobile asphalt plant from 6791 Ammann is designed for high mobility. This continuous plant can deliver 100tonnes/hour and features all of its main components inside a single standard shipping container. A company spokesperson said, “All you have to do is connect the bitumen tank and an electric power source.”

The new Prime 100 unit is the latest addition to the Prime range and is a smaller and even more mobile version of the well proven Prime 140, with its 140tonnes/hour capacity. In addition to its exceptional mobility the Prime 100 is very compact when assembled, while it takes around one working day to commission once it arrives onsite. The firm has designed the plant so that it can be set up quickly with only a minimum of site preparation needed. The spokesperson said, “As long as the base has been compacted, it can operate. The plant has everything it needs.”

Despite being smaller than the existing Prime 140, the new Prime 100 plant still features high-quality Ammann core components for high performance and a quality output.

For more information on companies in this article

Related Content

  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • Modified asphalt trials in Brazil
    October 17, 2012
    An urgent need to improve and extend its road network means that Brazil is open to innovation and new ideas - the timing looks good for Kraton and its highly modified asphalt. Kristina Smith reports On 15th August Brazilian president Dilma Rousseff announced a US$66 billion (BRL 133 billion) investment package for the country’s road and rail networks. Of that, $21 billion (BRL 42 billion) is earmarked for the upgrade or construction of 7,500km of highways through a series of concessions. “We’re starting an
  • Ammann’s electric asphalt paving innovations offer upgraded performance levels
    April 9, 2025

    Ammann is offering a new range of pavers, with its all-electric eABG4820 model taking centre stage. Also new is the ABG5420 paver, which benefits from a series of performance upgrades while retaining the firm’s highly effective screed design.

  • Special purpose add-ons for demolition excavators
    February 16, 2012
    Long reach demolition excavators are now special purpose machines, Dan Gilkes reports. The majority of construction equipment manufacturers offer a range of demolition specific machines, built to meet the needs of a sector of the industry that works its plant harder than most.