Skip to main content

Ammann goes big with the eABG 4820 Electric-Drive Paver

March 24, 2025 Read time: 1 min
The eABG 4820 paver uses a Variomatic screed and works at widths up to 6.5m

The new eABG 4820 electric drive paver from Ammann is currently the largest electric paver on the market, according to the company. It recently placed 1,200tonnes of asphalt in a day, while at the same time reducing CO2 emissions by 70%.

The paver uses a Variomatic screed and works at widths up to 6.5m. Paving output is 500tonnes/hour and maximum paving speed is 20m/minute. The hopper has a capacity of 12.7tonnes.

Ammann says that the tracked paver is a perfect match for jobsites with restrictions on sound and emissions. It has excelled on the placement of wear, binder and base courses on streets and parking lots.

Importantly, the paver has enough battery power to last an entire shift, regardless of the geography or the type of paving.

For more information on companies in this article

Related Content

  • New innovations for crushing and screening equipment market
    September 16, 2015
    Mobile crushing and screening solutions have become a key component for the aggregate production sector - Mike Woof writes. The market for mobile crushing and screening solutions has grown enormously in recent years. With the first track-mounted mobile units having appeared in the 1980s and pioneered by a small number of manufacturers, the range and variety of units on the market has grown enormously since.
  • Future-proofing construction & quarrying equipment sustainability
    February 16, 2023
    Sustainability is a huge topic across the construction and quarrying industry – not just in terms of what can be achieved tomorrow via carbon-free hydrogen fuel cells and hydrogen internal combustion engines of machine fleets, but today, through the use of smart technology to make jobsites more efficient and sustainable by getting work done right first time, every time
  • Indonesia toll road completed on schedule
    May 16, 2016
    The construction of the Cipali Toll Road in Indonesia has been completed on time, despite numerous challenges during its construction. The Cipali Toll Road forms part of a larger network, the Trans-Java Toll Road that connects key freeways in Jakarta and beyond. The Trans-Java Toll Road is of enormous importance to Indonesia as it runs for 653km and reduces the existing route by 40km.
  • Indonesia toll road completed on schedule
    May 16, 2016
    The construction of the Cipali Toll Road in Indonesia has been completed on time, despite numerous challenges during its construction. The Cipali Toll Road forms part of a larger network, the Trans-Java Toll Road that connects key freeways in Jakarta and beyond. The Trans-Java Toll Road is of enormous importance to Indonesia as it runs for 653km and reduces the existing route by 40km.