Skip to main content

Air freight

In Switzerland, an Opel delivery van had to be airlifted from a mountain, following a navigation error by its driver. The driver followed the directions given by his satellite navigation system, which told him to follow a narrow track that wound slowly upwards.
February 21, 2012 Read time: 1 min
In Switzerland, an Opel delivery van had to be airlifted from a mountain, following a navigation error by its driver. The driver followed the directions given by his satellite navigation system, which told him to follow a narrow track that wound slowly upwards. Trusting his GPS system, the man drove as directed up the narrow pathway until the vehicle could move no further. The van finally became firmly wedged between a fence and a stone wall and unable to turn around or reverse, the driver called the emergency services. They provided a helicopter to remove the van. However a local fireman praised the driver's off-road skills in negotiating the goat track in his Opel van.

Related Content

  • Construction robot deal for fischer
    October 23, 2024
    The fischer Group has bought up a construction robot pioneer.
  • Complete control of machines using technology
    December 12, 2019
    Sophisticated machine control technology has been utilised on heavy equipment to help deliver a challenging project in New Zealand
  • Sophisticated machine telematics packages offered
    September 27, 2013
    Several of the major equipment manufacturers now offer sophisticated telematics packages fitted as standard to their machines. Caterpillar and Komatsu were amongst the leaders in this field, allowing a high level of access to a machine's systems and sub-systems for performance monitoring, maintenance management and geofencing purposes for example. To the customer this offers the chance to address fleet running costs and utilisation, reduce the risk of theft and increase overall efficiency. Customers can eve
  • Steel sealed on Stonecutters Bridge
    February 6, 2012
    The stone mastic asphalt surface being laid on the bridge deck. The Stonecutters Bridge in Hong Kong, the second longest spanning cable stayed bridge in the world, is a dual three-lane crossing of the Rambler Channel. It utilises 33,500tonnes of structural steel in the bridge deck; 32,000m3 of concrete in the towers and 65 steel deck units relying on 224 cables. Effectively protecting the megastructure's deck from the weather extremes (monsoon rains and extreme heat in the summer) and the high levels of tra