Skip to main content

Aerial parking

A car park in the UK town of Farnborough should be helping with the chronic shortage of parking spaces in the locality. However despite having 70 car parking spaces, the facility has been unused for five years.
June 27, 2016 Read time: 1 min

The reason for this is that it has been constructed on top of a building and can only be accessed by pedestrians using a lift. Developers had originally planned to link it by bridge to another rooftop parking area on an adjacent building. However the other building was never constructed and the parking area has lain unused ever since, much to the embarrassment of the local authority that is attempting to improve the town’s parking shortage. Plans are in hand for another building alongside that would provide access but a time frame for its completion has not been given, so for the short term the parking area will remain unused.

Related Content

  • Fast, safe and sustainable transport for Johannesburg
    April 12, 2012
    GTZ highlights a pioneering scheme illustrating the potential of Bus Rapid Transit systems as a viable approach to alleviate the traffic and social problems faced by large cities worldwide Most major cities worldwide have been characterised by the phenomenon of steadily growing urbanisation accompanied by exponentially increasing numbers of private motorised vehicles. This has led to congested roads and sprawling cities, with commuters having to travel long distances to and from work. Despite huge inves
  • Geosynthetic drainage technology developments
    June 13, 2012
    An innovative solution to providing vital, low-impact surface water control for one of Britain’s largest local authority road schemes is said to have been recently achieved using Hydro International’s (HI) Hydro Vortex Drop Shaft  ow control technology. The new 7km bypass built by Costain at Church Village, near Pontypridd, South Wales, required careful planning to minimise its effect on the countryside and the local environment. Rhondda Cynon Taff Council needed to bypass Church Village to reduce traf c
  • Busy bridge in Beijing replaced quickly
    March 31, 2016
    The replacement of a very busy road bridge in China’s capital Beijing has been carried out successfully. Due to the volume of traffic using the bridge during week days, the work had to be carried out quickly so as to minimise traffic disruption. But despite being carried out in the centre of Beijing, the replacement work for the Sanyuan Bridge just took 43 hours from start to completion.
  • Highways: environmental problem or environmental enhancement?
    March 21, 2016
    Highways need not be a blight on the countryside that many people, urban planners included, believe they will always be. By Bram Miller, director, and Martin Broderick, environmental consultant, at Ramboll Environ While the world’s highway networks bring undoubted economic and social benefits, they are generally perceived to lead to negative environmental impacts. Some may consider this an unfair reputation, but it is difficult to argue that in the majority of cases both the construction and operation of