Skip to main content

Aerial parking

A car park in the UK town of Farnborough should be helping with the chronic shortage of parking spaces in the locality. However despite having 70 car parking spaces, the facility has been unused for five years.
June 27, 2016 Read time: 1 min

The reason for this is that it has been constructed on top of a building and can only be accessed by pedestrians using a lift. Developers had originally planned to link it by bridge to another rooftop parking area on an adjacent building. However the other building was never constructed and the parking area has lain unused ever since, much to the embarrassment of the local authority that is attempting to improve the town’s parking shortage. Plans are in hand for another building alongside that would provide access but a time frame for its completion has not been given, so for the short term the parking area will remain unused.

Related Content

  • Fehmarnbelt Tunnel start looms on the horizon - 2020
    October 20, 2017
    Work on the €7 billion immersed tunnel under the Fehmarnbelt could begin in 2020, according to the Danish state planning and operating company Femern. A construction start has been delayed on the 18km tunnel that will run between Germany and Denmark because of environmental and consultation issues in Germany. But Claus Baunkjaer, chief executive of Femern, said he is confident that Germany will give approval next year with another two years of preparations. Baunkjaer noted that Denmark is all set to p
  • New M90 surfacing in the UK gain praise
    January 8, 2013
    Early evaluation of surfacing work on the M90 at Rosyth – the first major application of Scotland’s new TS2010 specification – has earned positive praise. Transport Scotland’s determination to obtain pavement that is durable, long lasting and safe (especially in early life) is clearly apparent on the M90 just north of the Forth Road Bridge. Here surfacing has been carried out this spring to TS2010, a tough new specification designed to ensure thin surfacing pavements that work. And the initial prognosis is
  • Mini-bridge aids Forth repairs
    July 17, 2012
    An engineering "first" means that rehabilitation work on a vital Scottish bridge built over 40 years ago can be carried out smoothly A new report to the Forth Estuary Transport Authority (FETA) in Scotland recommends appointing Balfour Beatty Civil Engineering of Edinburgh as 'preferred bidder' to carry out the scheduled replacement of the bridge's main expansion joints in 2009. However, the report to the bridge authority says the tender price of £13.7 million (US$21.3 million) is some £5 million ($7.8 mill