Skip to main content

Aerial parking

A car park in the UK town of Farnborough should be helping with the chronic shortage of parking spaces in the locality. However despite having 70 car parking spaces, the facility has been unused for five years.
June 27, 2016 Read time: 1 min

The reason for this is that it has been constructed on top of a building and can only be accessed by pedestrians using a lift. Developers had originally planned to link it by bridge to another rooftop parking area on an adjacent building. However the other building was never constructed and the parking area has lain unused ever since, much to the embarrassment of the local authority that is attempting to improve the town’s parking shortage. Plans are in hand for another building alongside that would provide access but a time frame for its completion has not been given, so for the short term the parking area will remain unused.

Related Content

  • Digital transformation is delivering digital adoption
    August 15, 2023
    Digital transformation is key for transportation agencies and their partners to do their jobs better and faster. One way to do this is through digital delivery using digital models, data, and supporting field tools for roadway design, structures design, and construction, say the tech experts at Bentley Systems.
  • Vancouver’s 10-lane bridge replacement for Massey Tunnel remain undecided
    October 23, 2015
    Construction of a 10-lane bridge to replace a congested river tunnel in Vancouver, Canada, is still on target to start in 2017, despite details remaining sketchy.

    The bridge will replace the 60-year-old George Massey Tunnel between the local cities of Richmond and Delta along the provincial Highway 99. But the cost and – importantly – whether it will be a toll bridge have not been declared by the British Columbia provincial government.
  • Successful resurfacing at New York's JFK Airport
    February 8, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.
  • Successful resurfacing at New York's JFK Airport
    May 3, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.