Skip to main content

Aerial parking

A car park in the UK town of Farnborough should be helping with the chronic shortage of parking spaces in the locality. However despite having 70 car parking spaces, the facility has been unused for five years.
June 27, 2016 Read time: 1 min

The reason for this is that it has been constructed on top of a building and can only be accessed by pedestrians using a lift. Developers had originally planned to link it by bridge to another rooftop parking area on an adjacent building. However the other building was never constructed and the parking area has lain unused ever since, much to the embarrassment of the local authority that is attempting to improve the town’s parking shortage. Plans are in hand for another building alongside that would provide access but a time frame for its completion has not been given, so for the short term the parking area will remain unused.

Related Content

  • Delays on Slovakian projects
    July 9, 2012
    Work on several new highways being built in Slovakia as public-private partnerships (PPPs) will be delayed by six to 12 months. This means that the first sections of the Martin-Presov link will not open before 2011. The last section is expected to be completed in either late 2012 or early 2013.
  • Caterpillar’s senior executives outline the group’s drive for greater overall efficiency
    January 6, 2017
    Caterpillar senior executives Edward Rapp and David Bozeman have pinpointed “systems integration” as one of the equipment giant’s future targets. Speaking at Conexpo 2014 this week, Edward Rapp, Caterpillar group president said that the introduction of Tier 4 Final engine technology has been a landmark moment for Caterpillar but added that emissions systems are not the answer in themselves to improved performance. “The secret sauce is not the Tier 4, it’s the systems integration” said Rapp.
  • Caterpillar’s senior executives outline the group’s drive for greater overall efficiency
    March 6, 2014
    Caterpillar senior executives Edward Rapp and David Bozeman have pinpointed “systems integration” as one of the equipment giant’s future targets. Speaking at Conexpo 2014 this week, Edward Rapp, Caterpillar group president said that the introduction of Tier 4 Final engine technology has been a landmark moment for Caterpillar but added that emissions systems are not the answer in themselves to improved performance. “The secret sauce is not the Tier 4, it’s the systems integration” said Rapp.
  • Newark Bay Bridge upgrade approved
    March 31, 2025
    Approval given for the Newark Bay Bridge upgrade.