Skip to main content

Advanced GNSS capabilities with Topcon

April 9, 2025 Read time: 1 min
Topcon’s new GNSS tools offers more capabilities for users

Topcon Positioning says that its new HiPer XR offers more capabilities for GNSS duties. The HiPer receivers suit duties in survey applications, including engineering design, and cadastral projects. These versatile tools can also be used for construction site layout/stakeout, grade checking, and material volume calculations. HiPer receivers can also be paired with robotic total stations for Hybrid Positioning

The tools allow users to measure building edges without using an offset, or stretch to otherwise out-of-reach points using Topcon Integrated Levelling Technology (TILT). This novel technology allows the HiPer XR, HR and VR receivers to compensate for rods that are not exactly vertical. The latest version allows for a told of 60°. New features include the unit being calibration-free and the inclusion of a magnetic interference immune IMU system.

For more information on companies in this article

Related Content

  • Topcon beefs up eXchange AutoCAD 3D civil engineering software
    March 10, 2015
    Topcon’s latest eXchange software add-on for AutoCAD Civil 3D civil engineering design software converts data into files compatible with Topcon 3D construction solutions as well as the MAGNET software system. The add-on even converts complex road designs with defined corridors into Topcon standard file formats, such as MJF (MAGNET Field job) for land surveying and construction layout, and TP3 (3D Topcon Project File) for machine control systems. After installation, users are offered the ability to log in to
  • New innovations for crushing and screening equipment market
    September 16, 2015
    Mobile crushing and screening solutions have become a key component for the aggregate production sector - Mike Woof writes. The market for mobile crushing and screening solutions has grown enormously in recent years. With the first track-mounted mobile units having appeared in the 1980s and pioneered by a small number of manufacturers, the range and variety of units on the market has grown enormously since.
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • Innovations for asphalt compaction
    June 15, 2012
    Asphalt compaction advances were unveiled from an array of manufacturers at the INTERMAT 2012 event - Mike Woof reports. With new emissions legislation being introduced, manufacturers are rolling out a range of new asphalt compaction models designed to meet the latest requirements. These include both large rollers for high-production highway operations and compact machines designed for the rental market and suited to urban applications, with the latter segment becoming particularly competitive at present.