Skip to main content

Advanced asphalt production from Marini

April 11, 2025 Read time: 2 mins
Marini’s new asphalt plant advances offer high quality output using RAP

The new Marini Evodryer Plus plant is said to offer customers a sophisticated plant capable of handling high percentages of up to 70% RAP in the feed, while featuring just one drum. This slots into the range between the more complex and costly parallel drum plants able to handle up to 80% RAP in the feed, and the simpler existing units with just one drum that can handle up to 60% RAP in the feed.

The key to the plant is the way the hot gas generator is integrated into the single drum. “It’s a completely different concept,” said a company spokesperson.

The firm moved the dryer from the ground to the top of the plant as this eliminates the risk of the potentially sticky RAP material causing problems in an elevator. The design also reduces thermal dispersion.

Meanwhile, the drum has been extended by 3m and two small burners have been added, firing the hot gas generator. This patented design heats the materials in the drum efficiently but without the risk of overheating. Meanwhile the discharge system features insulated hoppers to prevent sticking when there is a high percentage of RAP in the mix.

The firm says that this advanced asphalt production system allows up to 70% RAP usage but without compromising on product quality. The plant suits medium-large production volumes with high RAP content but with just one drum, the plant is less costly to buy, has lower fuel costs and is simpler to maintain than sophisticated parallel drum plants.

For more information on companies in this article

Related Content

  • The best solution for using RAP in the asphalt mix
    September 28, 2023
    Sophisticated solutions allows the use of RAP in asphalt mixes.
  • Turkish bitumen innovation – from E-MAK
    September 13, 2016
    Turkish firm E-MAK has a reputation for delivering innovative solutions to the industry, with its presence at the bauma exhibition in Munich providing further proof. The firm’s two latest bitumen storage developments could cut costs for plant operators substantially. The new Bi SAS 300 system from E-MAK is intended to cut the cost of bitumen storage by lowering heating bills. According to E-MAK’s chairman, S Nezir Gencer, the operators of most asphalt plants tend to focus on how much fuel the burners used t
  • Asphalt plant innovations from key firms
    June 12, 2017
    Asphalt plant builders continue to develop new technologies to meet different demands from clients. Marini says that in addition to developing new and more sophisticated asphalt plants, the firm is also meeting demands from customers looking to upgrade existing asphalt plants with the addition of new systems. These can be used to boost output and material quality, while also delivering new grades of mixes. At the same time, plant upgrades can reduce the environmental profile of a plant, while improving its
  • Using technology to reduce the carbon footprint in asphalt production
    February 13, 2023
    According to Benninghoven, reducing the carbon footprint in asphalt production is feasible by using the latest technology